Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
143 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 2of 5 | WIDEN NON-FREEWAY FROM TWO TO FOUR LANES | FORT BEND | 2019-09-06 | $89,022,976.05 | $81,760,171.41 |
| Rank 2of 5 | WIDEN NON FREEWAY FROM TWO TO FOUR LANES | FORT BEND | 2019-09-06 | $45,186,106.40 | $42,315,988.83 |
| Rank 2of 5 | WIDEN NON-FREEWAY FROM TWO TO FOUR LANES | BRAZORIA | 2019-09-05 | $82,113,195.60 | $75,955,686.00 |
| Rank 4of 5 | WIDEN FREEWAY | BEXAR | 2019-08-07 | $101,769,786.90 | $91,651,868.27 |
| Rank 4of 4 | GR, STRS, BASE, SURF, SIGN & UTIL | BEXAR | 2019-07-09 | $91,077,533.17 | $77,332,883.27 |
| Rank 3of 7 | REPLACE BRG & APPR,GR,STORM SEWER,BASE, SURF | ELLIS | 2019-06-05 | $24,827,479.85 | $23,695,770.71 |
| Rank 7of 9 | WIDEN FROM 2 TO 4 LANES | MONTGOMERY | 2019-05-08 | $47,007,814.56 | $36,793,630.18 |
| Rank 2of 5 | REHABILITATION OF EXISTING ROAD | PARKER | 2019-05-08 | $23,534,682.31 | $23,361,070.20 |
| Rank 10of 12 | WDN, GR, STRS, SURF | HILL | 2019-05-07 | $152,029,126.45 | $133,117,085.97 |
| Rank 9of 9 | WIDEN TO 4-LANE DIVIDED | HARRIS | 2019-03-05 | $51,886,306.50 | $43,751,962.98 |
| Rank 3of 4 | WIDEN TO 6 MAIN LANES WITH FRONTAGE ROADS | LIBERTY | 2018-09-07 | $116,821,065.25 | $102,150,732.13 |
| Low bidof 9 | GR, DR, STR, BS AND PAVEMENT | HOOD | 2018-08-07 | $60,713,830.16 | $60,713,830.16 |
| Rank 3of 9 | GRADING, STRUCTURES, PAVEMENT & STR | TARRANT | 2018-08-07 | $52,260,362.16 | $48,586,586.00 |
| Low bidof 5 | CONSTRUCT RELIEF ROUTE AROUND DRISCOLL | NUECES | 2018-07-11 | $118,322,898.17 | $118,322,898.17 |
| Rank 6of 7 | WIDEN FROM 2 TO 4 LANES DIVIDED ROADWAY | FORT BEND | 2018-07-11 | $21,983,847.93 | $18,950,219.53 |
| Low bidof 4 | EXPAND TO 6 LN EXPWY WITH FR RD 4 GEN - 2 HOV | BEXAR | 2018-07-10 | $178,383,491.74 | $178,383,491.74 |
| Rank 9of 9 | WIDEN 2 TO 6 LANE DIVIDED & REPLACE RR STR | DENTON | 2018-07-10 | $52,035,641.05 | $43,621,757.47 |
| Rank 3of 7 | WIDEN AND RECONSTRUCT 4 TO 6 GENERAL PURPOSE LANES | DALLAS | 2018-06-06 | $29,304,294.03 | $27,907,948.34 |
| Rank 7of 10 | CONSTRUCT 0/4 LN FRTG RDS AND RAMP MODIFICATIONS | DALLAS | 2018-06-06 | $41,795,079.75 | $37,840,877.84 |
| Rank 4of 6 | EXPAND FROM 4 LANE DIVIDED TO 4 LANE EXPRESSWAY | BEXAR | 2018-06-05 | $49,122,615.24 | $45,888,888.82 |
| Rank 3of 5 | EXPAND FROM 4 TO 6 LANE EXPRESSWAY | BEXAR | 2018-05-01 | $131,852,966.33 | $119,776,274.22 |
| Rank 10of 11 | WIDEN FROM 2 LANES TO 6 LANES URBAN DIVIDED | ELLIS | 2018-05-01 | $38,373,330.53 | $32,207,126.84 |
| Rank 10of 11 | CONSTRUCT_GRADE SEPARATION | MONTGOMERY | 2018-04-03 | $28,270,263.65 | $23,483,270.27 |
| Rank 9of 9 | WIDEN TWO LANE RURAL TO SIX LANE URBAN DIVIDED | DENTON | 2018-03-07 | $20,708,595.57 | $18,011,511.00 |
| Rank 7of 9 | GRAD, BS, STR, SURF, PVMT MRKG | KENDALL | 2018-03-06 | $75,888,159.11 | $64,660,757.43 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.