Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
123 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 4of 4 | REHABILITATE BRIDGE | BASTROP | 2020-04-08 | $1,442,718.50 | $863,707.80 |
| Rank 5of 5 | FERRY LANDING GRATING PANEL SYSTEM | NUECES | 2020-04-08 | $2,511,200.00 | $400,545.00 |
| Rank 5of 5 | REPAIR STEEL BRIDGE MEMBERS | HARRIS | 2020-03-13 | $407,319.00 | $174,426.00 |
| Rank 5of 5 | FULL DEPTH CONCRETE REPAIR | HOPKINS | 2020-02-07 | $3,374,600.00 | $1,777,711.00 |
| Rank 11of 11 | MISCELLANEOUS BRIDGE REPAIR | TAYLOR | 2020-02-06 | $1,924,780.00 | $798,993.99 |
| Rank 2of 2 | ROADWAY SPALL & FULL DEPTH REPAIR ON CONCRETE PAV | EL PASO | 2020-02-06 | $1,052,250.00 | $678,000.00 |
| Rank 2of 3 | DOLPHIN AND FERRY FENDER REPAIR | NUECES | 2020-01-09 | $9,803,500.00 | $9,587,600.00 |
| Rank 2of 5 | REPLACE BEARING PADS | BRAZORIA | 2019-12-04 | $555,073.47 | $537,033.22 |
| Rank 4of 5 | BRIDGE REPAIR | ECTOR | 2019-12-04 | $1,343,629.00 | $1,070,006.40 |
| Rank 3of 4 | REHABILITATE EXISTING BRIDGE | LAVACA | 2019-12-04 | $1,223,642.00 | $699,018.40 |
| Rank 4of 5 | BRIDGE MAINTENANCE | HARRIS | 2019-12-04 | $658,555.00 | $350,747.50 |
| Rank 2of 4 | BRIDGE MAINTENANCE | COLORADO | 2019-12-03 | $6,589,804.80 | $4,243,334.00 |
| Rank 3of 6 | PERMANENT BRIDGE REPAIRS NBI# 12102027115377 | HARRIS | 2019-11-06 | $3,499,450.50 | $3,159,415.95 |
| Rank 3of 5 | REPAIR/REPLACE DOLPHIN | JEFFERSON | 2019-11-06 | $3,235,200.00 | $1,776,487.50 |
| Rank 4of 4 | SCOUR PROTECTION, PAINTING, RIP RAP | FREESTONE | 2019-10-08 | $599,350.00 | $229,055.00 |
| Rank 2of 4 | BRIDGE MAINTENANCE | NUECES | 2019-09-06 | $2,677,329.00 | $2,419,991.80 |
| Rank 3of 4 | BRIDGE MAINTENANCE | REFUGIO | 2019-09-05 | $2,142,462.70 | $1,136,958.00 |
| Rank 4of 6 | BRIDGE MAINTENANCE | POLK | 2019-08-07 | $1,873,276.00 | $1,536,274.10 |
| Rank 5of 5 | BRIDGE PREVENTATIVE MAINTENANCE | BAYLOR | 2019-08-07 | $1,590,685.00 | $833,012.50 |
| Rank 4of 7 | BRIDGE MAINTENANCE | SHELBY | 2019-08-06 | $4,388,524.20 | $3,364,209.01 |
| Rank 8of 8 | BRIDGE PREVENTATIVE MAINTENANCE | SABINE | 2018-12-06 | $1,330,182.00 | $717,347.00 |
| Low bidof 4 | BRIDGE REHABILITATION (DALE MILLER BRIDGE) | NUECES | 2018-11-06 | $4,671,605.00 | $4,671,605.00 |
| Rank 4of 4 | PAINTING STRUCTURE | HARRIS | 2017-03-14 | $701,585.00 | $196,639.42 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.