Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
697 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 2of 2 | ROCK/RIPRAP | WASHINGTON | 2024-07-24 | $287,300.00 | $238,085.00 |
| Rank 2of 2 | HYDRAULIC CEMENT/BULK&BAG/NACOGDOCHES (SHE&SANAUG) | NACOGDOCHES | 2024-07-23 | $209,836.00 | $204,332.80 |
| Rank 2of 3 | HYDRAULIC CEMENT/BAG/ANGELINA (HOUSTON & SABINE) | ANGELINA | 2024-07-23 | $61,376.00 | $61,098.24 |
| Low bidof 4 | FLEXIBLE BASE | WALKER | 2024-07-23 | $228,000.00 | $228,000.00 |
| Low bidof 2 | AGGREGATE | PECOS | 2024-07-16 | $47,500.00 | $47,500.00 |
| Low bidof 2 | AGGREGATE | MIDLAND | 2024-07-16 | $52,500.00 | $52,500.00 |
| Low bidof 2 | ROCK/RIPRAP | BRAZOS | 2024-06-18 | $299,000.00 | $299,000.00 |
| Low bidof 3 | FLEXIBLE BASE | WASHINGTON | 2024-06-12 | $163,500.00 | $163,500.00 |
| Rank 2of 3 | FLEXIBLE BASE | KAUFMAN | 2024-06-11 | $160,000.00 | $140,000.00 |
| Rank 2of 2 | LIME | KAUFMAN | 2024-06-11 | $15,000.00 | $13,500.00 |
| Low bidof 2 | FLEXIBLE BASE | DENTON | 2024-06-11 | $17,500.00 | $17,500.00 |
| Low bidof 3 | FLEXIBLE BASE | BRAZOS | 2024-06-10 | $189,000.00 | $189,000.00 |
| Rank 3of 3 | HERBICIDE/INSECTICIDE | GARZA | 2024-06-06 | $5,048,733.10 | $3,433,047.15 |
| Rank 3of 3 | HERBICIDE/INSECTICIDE | HENDERSON | 2024-06-06 | $6,291,214.10 | $4,115,798.15 |
| Rank 3of 3 | HERBICIDE/INSECTICIDE | GUADALUPE | 2024-06-06 | $4,175,425.90 | $2,807,579.85 |
| Rank 4of 4 | HOT-MIX COLD-LAID | TAYLOR | 2024-06-06 | $907,500.00 | $781,720.00 |
| Low bidof 2 | HYDRAULIC CEMENT | WALKER | 2024-06-05 | $529,715.20 | $529,715.20 |
| Rank 2of 2 | DE-ICING SALT | GRAYSON | 2024-06-05 | $1,207,400.00 | $911,747.20 |
| Rank 3of 3 | HYDRAULIC CEMENT | FRANKLIN | 2024-06-05 | $586,959.75 | $555,963.75 |
| Low bidof 2 | FLEXIBLE BASE/TY E/SHELBY (NAC & SAN AUG) | SHELBY | 2024-05-30 | $205,000.00 | $205,000.00 |
| Low bidof 2 | HYDRAULIC CEMENT/BULK&BAG/SAN JACINTO (POLK&TRIN) | SAN JACINTO | 2024-05-30 | $123,344.00 | $123,344.00 |
| Rank 3of 3 | AGGREGATE | RUNNELS | 2024-05-28 | $250,600.00 | $202,248.00 |
| Low bidof 1 | SAND | COKE | 2024-05-28 | $61,500.00 | $61,500.00 |
| Low bidof 2 | AGGREGATE | JOHNSON | 2024-05-16 | $170,000.00 | $170,000.00 |
| Low bidof 1 | FLEXIBLE BASE | PECOS | 2024-05-14 | $56,000.00 | $56,000.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.