Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
702 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Low bidof 3 | AGGREGATE | COLLIN | 2022-06-07 | $70,000.00 | $70,000.00 |
| Rank 2of 3 | FLEXIBLE BASE | CHAMBERS | 2022-06-07 | $32,500.00 | $30,000.00 |
| Rank 3of 3 | PAINT AND BEADS | RANDALL | 2022-05-05 | $655,000.00 | $603,250.00 |
| Low bidof 2 | HYDRAULIC CEMENT | SHELBY | 2022-04-28 | $141,593.60 | $141,593.60 |
| Low bidof 2 | HYDRAULIC CEMENT | ANGELINA | 2022-04-26 | $100,000.00 | $100,000.00 |
| Low bidof 1 | ASPHALTIC PATCHING MATERIAL | COLLIN | 2022-04-26 | $361,700.00 | $361,700.00 |
| Rank 2of 2 | HYDRAULIC CEMENT | POLK | 2022-04-19 | $28,500.00 | $26,600.00 |
| Low bidof 2 | HYDRAULIC CEMENT | HOUSTON | 2022-04-19 | $140,784.00 | $140,784.00 |
| Low bidof 2 | AGGREGATE | MIDLAND | 2022-04-12 | $63,000.00 | $63,000.00 |
| Low bidof 1 | AGGREGATE | SHELBY | 2022-03-22 | $320,850.00 | $320,850.00 |
| Rank 4of 4 | FLEXIBLE BASE | KLEBERG | 2022-03-22 | $399,500.00 | $334,220.00 |
| Rank 5of 5 | FLEXIBLE BASE | ARANSAS | 2022-03-22 | $493,000.00 | $351,560.00 |
| Rank 5of 5 | FLEXIBLE BASE | SAN PATRICIO | 2022-03-22 | $403,750.00 | $255,000.00 |
| Rank 4of 4 | AGGREGATE | BEXAR | 2022-03-17 | $477,000.00 | $334,856.50 |
| Rank 4of 4 | AGGREGATE | MEDINA | 2022-03-17 | $475,800.00 | $309,182.50 |
| Rank 3of 4 | AGGREGATE | COMAL | 2022-03-16 | $484,500.00 | $338,055.00 |
| Low bidof 1 | FLOWABLE FILL | BEXAR | 2022-03-16 | $171,000.00 | $171,000.00 |
| Rank 2of 3 | AGGREGATE | DUVAL | 2022-03-16 | $68,000.00 | $66,487.00 |
| Low bidof 1 | HOT-MIX (MATERIALS ONLY) | BROWN | 2022-03-16 | $410,000.00 | $410,000.00 |
| Low bidof 2 | FLEXIBLE BASE | ECTOR | 2022-03-08 | $26,800.00 | $26,800.00 |
| Rank 2of 2 | FLEXIBLE BASE | MIDLAND | 2022-03-08 | $77,500.00 | $75,250.00 |
| Low bidof 2 | FLEXIBLE BASE | PECOS | 2022-03-08 | $36,500.00 | $36,500.00 |
| Rank 3of 3 | ROCK/RIPRAP | POLK | 2022-03-08 | $50,000.00 | $32,000.00 |
| Rank 2of 2 | ROCK/RIPRAP | GREGG | 2022-03-03 | $670,900.00 | $657,700.00 |
| Low bidof 2 | MATERIALS ONLY: HYDRAULIC CEMENT CONCRETE | HENDERSON | 2022-03-03 | $298,000.00 | $298,000.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.