Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
702 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 2of 2 | AGGREGATE | BEE | 2021-11-16 | $512,200.00 | $378,180.00 |
| Low bidof 1 | AGGREGATE | TERRY | 2021-11-15 | $336,200.00 | $336,200.00 |
| Low bidof 1 | AGGREGATE | LAMB | 2021-11-15 | $326,300.00 | $326,300.00 |
| Low bidof 1 | AGGREGATE | HALE | 2021-11-15 | $188,050.00 | $188,050.00 |
| Rank 3of 3 | FLEXIBLE BASE | FAYETTE | 2021-11-09 | $199,500.00 | $123,525.00 |
| Low bidof 3 | SEAL COAT AGGREGATE (MATERIAL ONLY) | BASTROP | 2021-11-04 | $928,434.70 | $928,434.70 |
| Rank 3of 3 | HOT MIX (MATERIAL ONLY) | HALE | 2021-11-04 | $516,250.00 | $470,950.00 |
| Rank 2of 2 | HOT MIX (MATERIAL ONLY) | LUBBOCK | 2021-11-04 | $685,262.50 | $603,200.00 |
| Rank 2of 2 | AGGREGATE (MATERIAL ONLY) | HENDERSON | 2021-11-04 | $1,148,300.00 | $1,078,025.00 |
| Rank 3of 4 | AGGREGATE (MATERIAL ONLY) | EL PASO | 2021-11-03 | $480,477.00 | $273,001.10 |
| Low bidof 2 | FLEXIBLE BASE | VICTORIA | 2021-10-29 | $153,000.00 | $153,000.00 |
| Rank 2of 2 | LIME | WHARTON | 2021-10-29 | $241,400.00 | $210,800.00 |
| Rank 2of 4 | HYDRAULIC CEMENT | WHARTON | 2021-10-28 | $261,720.00 | $258,840.00 |
| Low bidof 2 | WINTER WEATHER MATERIAL | BEXAR | 2021-10-20 | $250,300.00 | $250,300.00 |
| Rank 3of 3 | WINTER WEATHER MATERIALS | BEXAR | 2021-10-20 | $190,960.00 | $153,654.00 |
| Rank 5of 5 | WINTER WEATHER MATERIALS | BEXAR | 2021-10-20 | $230,600.00 | $66,474.00 |
| Rank 2of 3 | WINTER WEATHER MATERIAL | REAGAN | 2021-10-19 | $173,680.00 | $145,680.00 |
| Low bidof 3 | HYDRAULIC CEMENT | TOM GREEN | 2021-10-19 | $19,353.60 | $19,353.60 |
| Rank 2of 3 | WINTER WEATHER MATERIAL | BRAZOS | 2021-10-19 | $160,520.00 | $136,040.00 |
| Rank 3of 3 | WINTER WEATHER MATERIAL | BRAZOS | 2021-10-19 | $28,800.00 | $12,200.00 |
| Rank 2of 4 | HYDRAULIC CEMENT | WASHINGTON | 2021-10-13 | $72,009.24 | $70,919.20 |
| Rank 3of 3 | SAND | MIDLAND | 2021-10-12 | $26,100.00 | $18,630.00 |
| Rank 3of 6 | CONCRETE SPALL REPAIR | BRAZORIA | 2021-10-12 | $57,000.00 | $45,780.00 |
| Rank 3of 4 | HYDRAULIC CEMENT | BRAZOS | 2021-10-12 | $72,290.24 | $70,519.20 |
| Rank 3of 5 | HYDRAULIC CEMENT | WALKER | 2021-10-12 | $98,241.32 | $94,611.36 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.