Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
125 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 2of 5 | Large Guide Sign Repair/Replace IH 10 | FAYETTE | 2025-10-22 | $213,843.70 | $205,668.40 |
| Rank 2of 4 | 6492-23-001 Cleaning & Sealing Cracks | PECOS | 2025-10-21 | $327,541.00 | $175,695.80 |
| Rank 7of 9 | FY 26 KERR PICNIC MAINTENANCE | KERR | 2025-09-17 | $994,840.00 | $524,272.00 |
| Rank 4of 4 | FY 25, CCA Repair/Replacement Galveston | GALVESTON | 2025-09-09 | $937,637.30 | $488,680.00 |
| Rank 6of 7 | GTAO - FY 25 Small Sign Upgrades | TRAVIS | 2025-07-02 | $665,430.00 | $504,526.50 |
| Rank 3of 3 | 6482-72-001 IH 45 General Maintenance | HARRIS | 2025-07-01 | $5,605,539.00 | $4,988,410.00 |
| Rank 4of 7 | 6481-06-001 ATTENUATOR REPAIRS | HARRIS | 2025-06-05 | $998,779.00 | $754,394.00 |
| Low bidof 3 | General Maintenance FY 26 | HARRIS | 2025-06-04 | $7,981,348.60 | $7,981,348.60 |
| Rank 6of 6 | 6476-04-001 Guardrail Repairs FY25 | HARRIS | 2025-05-01 | $1,459,704.00 | $1,126,484.00 |
| Rank 4of 8 | FY25 Brazoria Guardrail RMC | BRAZORIA | 2025-03-11 | $864,008.00 | $678,427.00 |
| Rank 9of 15 | SFT | FM 218 | @ FM 1702 | HAMILTON | 2025-03-04 | $198,750.00 | $133,517.11 |
| Rank 5of 5 | RAISED PAVEMENT MARKERS - BELL DW | BELL | 2025-02-25 | $578,874.00 | $414,447.50 |
| Low bidof 6 | FY 25 MBGF | CHAMBERS | 2025-02-18 | $258,947.00 | $258,947.00 |
| Rank 3of 4 | Bundle Bid Rdwy Maint. IH 45, etc. | HARRIS | 2025-02-06 | $5,445,102.50 | $4,149,300.00 |
| Rank 4of 4 | 2024-11 San Jacinto MBGF | SAN JACINTO | 2025-01-15 | $263,720.00 | $143,895.00 |
| Low bidof 3 | FY 2025 Brazoria Sign Upgrades | BRAZORIA | 2025-01-14 | $475,750.00 | $475,750.00 |
| Rank 2of 6 | FY 24, CCA Replacement, N Harris | HARRIS | 2025-01-14 | $581,050.00 | $516,859.00 |
| Rank 2of 4 | FY25 Walker/Madison MBGF -01 | WALKER | 2025-01-14 | $555,225.00 | $465,520.00 |
| Low bidof 10 | FY 25-DISTRICT WIDE-OH SIGN REPLACE | JEFFERSON | 2025-01-08 | $797,582.25 | $797,582.25 |
| Rank 5of 8 | METAL BEAM GUARD FENCE REPAIR | FORT BEND | 2024-12-03 | $1,156,025.00 | $732,257.00 |
| Low bidof 1 | TREE REMOVAL | WASHINGTON | 2024-11-19 | $261,500.00 | $261,500.00 |
| Rank 5of 5 | METAL BEAM GUARD FENCE REPAIR | SAN JACINTO | 2024-11-13 | $320,265.00 | $107,700.00 |
| Rank 6of 6 | DEBRIS REMOVAL | ANGELINA | 2024-11-13 | $1,355,090.00 | $740,808.00 |
| Rank 3of 3 | TREE TRIMMING AND BRUSH REMOVAL | JEFFERSON | 2024-11-13 | $670,142.00 | $404,890.00 |
| Rank 5of 5 | TREE TRIMMING AND BRUSH REMOVAL | LIBERTY | 2024-11-13 | $360,585.00 | $179,275.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.