Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
11 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 4of 5 | REHABILITATE EXISTING PAVEMENT AND ADD SHOULDERS | DENTON | 2020-09-04 | $10,545,222.34 | $8,828,849.77 |
| Low bidof 5 | HAZARD ELIMINATION & SAFETY | HUNT | 2020-08-05 | $523,372.14 | $523,372.14 |
| Rank 7of 9 | RECONST EXT PAV & PROVIDE ADD PAVED SURF WIDTH | COLLIN | 2020-07-09 | $8,108,976.20 | $5,875,116.59 |
| Rank 5of 5 | REHABILITATE EXISTING ROADWAY | FANNIN | 2020-07-09 | $4,889,137.00 | $3,637,497.58 |
| Rank 7of 7 | REHABILITATE EXISTING ROADWAY | LAMAR | 2020-07-08 | $3,703,728.50 | $2,265,145.83 |
| Rank 7of 9 | CONSTRUCT RAMPS | TARRANT | 2020-07-08 | $2,003,457.62 | $1,779,729.96 |
| Rank 8of 9 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH | COLLIN | 2020-06-05 | $5,709,788.57 | $4,241,990.56 |
| Rank 6of 7 | RESURFACE ROADWAY | WISE | 2020-06-05 | $916,762.12 | $808,032.39 |
| Rank 8of 8 | ADD RAISED MEDIAN LEFT & RIGHT TURN LN & RESTRIPE | DENTON | 2020-06-04 | $27,816,206.32 | $21,269,536.66 |
| Rank 8of 9 | FULL DEPTH CONCRETE REPAIRS AND PAVEMENT MARKINGS | DENTON | 2020-03-04 | $1,784,554.00 | $997,920.80 |
| Rank 6of 7 | REPAIR SLOPE FAILURE AND ROADWAY | GRAYSON | 2019-03-05 | $2,657,920.30 | $1,629,373.40 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.