Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
14 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 4of 4 | RESURFACE ROADWAY | JEFFERSON | 2023-08-02 | $1,686,000.00 | $969,969.00 |
| Rank 5of 5 | BRIDGE MAINTENANCE | HEMPHILL | 2022-03-03 | $11,188,111.00 | $8,566,511.52 |
| Rank 4of 4 | HIGH FRICTION SURFACE TREATMENT | CASS | 2020-08-06 | $3,155,000.00 | $2,417,417.00 |
| Rank 3of 4 | OVERLAY | HILL | 2020-03-04 | $4,663,333.00 | $3,699,699.00 |
| Rank 5of 5 | MILLED CENTERLINE RUMBLE STRIPS | WICHITA | 2019-08-06 | $1,225,701.25 | $761,013.13 |
| Rank 4of 4 | HIGH FRICTION SURFACE TREATMENT | WICHITA | 2019-01-09 | $787,000.00 | $433,433.00 |
| Rank 7of 7 | HIGH FRICTION SURFACE TREATMENT (CU | NOLAN | 2018-02-02 | $777,444.00 | $597,597.00 |
| Low bidof 4 | SFTY TREAT FXD OBJ | HARDIN | 2017-07-12 | $1,011,480.75 | $1,011,480.75 |
| Rank 3of 4 | INSTALL ADVANCE CURVE WARNING SIGNALS & SIGNS | LLANO | 2017-06-06 | $575,059.17 | $514,230.77 |
| Rank 2of 6 | CONCRETE REPAIR | GARZA | 2017-04-05 | $2,560,010.15 | $2,405,439.70 |
| Rank 2of 2 | SURFACE TREAT AND INSTALL CHEVRONS | NOLAN | 2017-03-07 | $2,099,999.99 | $1,848,432.22 |
| Rank 4of 4 | HIGH FRICTION SURFACE TREATMENT | BRAZOS | 2017-02-02 | $129,250.50 | $65,138.90 |
| Rank 2of 4 | HIGH FRIC SURF TRTMNT | BELL | 2017-02-02 | $180,090.90 | $115,598.20 |
| Low bidof 3 | BASE, SURF, GRADE & PAVEMENT MARKINGS | UVALDE | 2016-11-04 | $1,559,435.35 | $1,559,435.35 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.