Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
235 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Low bidof 1 | MOWING OF HIGHWAYS RIGHT-OF-WAY | VAL VERDE | 2017-11-15 | $162,045.26 | $162,045.26 |
| Rank 4of 5 | MOWING HIGHWAY RIGHT OF WAY | BASTROP | 2017-11-02 | $409,936.60 | $327,328.48 |
| Low bidof 1 | MOWING OF HIGHAYS RIGHT OF WAY | MAVERICK | 2017-10-31 | $281,522.93 | $281,522.93 |
| Low bidof 1 | MOWING OF HIGHWAYS RIGHT OF WAY | KINNEY | 2017-10-31 | $264,787.04 | $264,787.04 |
| Rank 3of 3 | MOWING HIGHWAY RIGHT OF WAY | BURNET | 2017-10-24 | $312,348.40 | $256,024.00 |
| Rank 2of 2 | MOWING HIGHWAY RIGHT OF WAY | BLANCO | 2017-10-24 | $252,010.40 | $205,444.00 |
| Rank 2of 4 | ROADSIDE MOWING | BROWN | 2017-10-17 | $323,661.00 | $287,531.40 |
| Rank 3of 5 | ROADSIDE MOWING | COLEMAN | 2017-10-17 | $275,841.83 | $212,586.50 |
| Low bidof 4 | ROADSIDE MOWING | MCCULLOCH | 2017-10-17 | $233,184.44 | $233,184.44 |
| Rank 5of 5 | CHANNEL REPAIR AND REPLACE CULVERT | COMAL | 2017-09-27 | $348,285.00 | $227,147.00 |
| Rank 2of 3 | HAULING ROADWAY MATERIAL | JEFFERSON | 2017-09-12 | $213,370.00 | $189,150.00 |
| Low bidof 2 | RIGHT OF WAY MOWING REAL/EDWARDS CNTY | REAL | 2017-08-30 | $236,404.04 | $236,404.04 |
| Low bidof 2 | RIGHT OF WAY MOWING IN KIMBLE COUNTY | KIMBLE | 2017-08-30 | $181,064.96 | $181,064.96 |
| Low bidof 2 | RIGHT OF WAY MOWING IN TOM GREEN URBAN | TOM GREEN | 2017-08-30 | $139,530.20 | $139,530.20 |
| Rank 3of 7 | REMOVE AND REPLACE CROSS DRAINAGE | FREESTONE | 2017-08-15 | $284,937.00 | $233,742.00 |
| Low bidof 1 | MOWING OF HIGHWAYS RIGHT-OF-WAY | DUVAL | 2017-07-25 | $214,059.60 | $214,059.60 |
| Low bidof 12 | CLEARING AND GRUBBING | ANGELINA | 2017-07-12 | $890,456.22 | $890,456.22 |
| Low bidof 2 | INSTALLATION OF DRIVEWAY PIPE | BRAZOS | 2017-07-11 | $649,408.00 | $649,408.00 |
| Rank 3of 3 | MOWING | BEE | 2017-05-16 | $285,033.52 | $241,424.00 |
| Rank 3of 3 | MOWING | GOLIAD | 2017-05-16 | $245,018.44 | $162,776.50 |
| Rank 2of 2 | MOWING | SAN PATRICIO | 2017-05-16 | $246,782.38 | $230,764.00 |
| Low bidof 2 | MOWING | ARANSAS | 2017-05-16 | $184,379.80 | $184,379.80 |
| Rank 2of 3 | MOWING | JIM WELLS | 2017-05-16 | $300,699.67 | $268,064.80 |
| Rank 2of 2 | MOWING | NUECES | 2017-05-16 | $113,755.96 | $110,157.64 |
| Rank 2of 2 | MOWING | NUECES | 2017-05-16 | $263,191.36 | $260,283.88 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.