Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
17 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Low bidof 5 | FM 521 SAFETY IMPROVEMENT 2702 | MATAGORDA | 2026-05-07 | $5,637,914.82 | $5,637,914.82 |
| Rank 2of 8 | FM 1456 REHABILITATE ROADWAY HSIP 2605 | AUSTIN | 2026-05-06 | $2,697,120.28 | $2,587,895.46 |
| Rank 7of 7 | SanPatIH37WFrontage234-Cooper | SAN PATRICIO | 2026-03-04 | $3,586,046.30 | $2,258,368.22 |
| Rank 3of 7 | Flexbase - WAO (Materials Only) | WHARTON | 2026-02-17 | $418,000.00 | $376,875.00 |
| Rank 3of 3 | Rock/Riprap - WAO (Materials Only) | WHARTON | 2026-02-17 | $145,320.00 | $92,750.00 |
| Rank 4of 5 | 6497-59-001 Flex Base Beeville | BEE | 2026-02-17 | $248,950.00 | $220,025.00 |
| Rank 5of 8 | TPW - Dickinson Marine Lab | GALVESTON | 2026-02-05 | $799,090.30 | $736,599.00 |
| Rank 3of 11 | PW STATE PARK IMPROVEMENTS 2019 | CALHOUN | 2026-02-04 | $432,347.27 | $342,249.80 |
| Rank 7of 7 | US 90A 2022 HSIP | LAVACA | 2026-02-04 | $3,186,999.40 | $2,212,468.60 |
| Rank 4of 7 | FM 1160 WIDEN STRUCTURE 2610 | WHARTON | 2026-01-06 | $2,122,809.10 | $1,897,773.35 |
| Rank 3of 7 | FM 331 REHABILITATE ROADWAY 2612 | AUSTIN | 2025-12-02 | $12,296,186.63 | $10,744,492.63 |
| Rank 7of 7 | FM 3084 REHABILITATE ROADWAY HSIP 2605 | CALHOUN | 2025-07-01 | $7,334,598.24 | $4,398,168.09 |
| Rank 3of 3 | FLEXIBLE BASE (MATERIAL ONLY) | COLORADO | 2020-03-25 | $9,700.00 | $7,425.00 |
| Rank 3of 3 | FLEXIBLE BASE (MATERIAL ONLY) | JACKSON | 2020-03-25 | $19,980.00 | $15,500.00 |
| Rank 2of 4 | FLEXIBLE BASE (MATERIAL ONLY) | LAVACA | 2020-03-25 | $7,965.00 | $7,075.00 |
| Rank 3of 4 | FLEXIBLE BASE (MATERIAL ONLY) | VICTORIA | 2020-03-25 | $9,820.00 | $8,000.00 |
| Rank 3of 4 | FLEXIBLE BASE (MATERIAL ONLY) | MATAGORDA | 2020-03-25 | $13,815.00 | $12,105.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.