Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
352 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 4of 6 | BOX CULVERT STRUCTURAL REPAIR | HUDSPETH | 2018-02-02 | $81,882.00 | $54,568.00 |
| Rank 9of 10 | REPLACE CULVERT STRUCTURE | HAYS | 2018-02-02 | $425,365.00 | $260,107.32 |
| Rank 6of 6 | BRIDGE PREVENTATIVE MAINTENANCE | ROCKWALL | 2018-02-01 | $740,620.00 | $525,013.00 |
| Rank 8of 10 | BRIDGE PREVENTIVE MAINTENANCE | BOWIE | 2018-02-01 | $1,415,180.00 | $853,995.00 |
| Rank 5of 7 | CONSTRUCT SHARED USE PATH | LAMAR | 2017-09-07 | $990,755.40 | $679,839.40 |
| Rank 6of 7 | CONSTRUCT SHARED USE PATH | RED RIVER | 2017-09-07 | $1,404,085.00 | $967,747.60 |
| Rank 8of 8 | SAFETY TREAT FIXED OBJECTS | TARRANT | 2017-08-09 | $701,542.40 | $281,936.15 |
| Rank 3of 6 | MISCELLANEOUS BRIDGE REPAIR | BROWN | 2017-08-09 | $644,628.00 | $564,232.00 |
| Rank 4of 5 | SAFETY TREAT FIXED OBJECTS | GRAYSON | 2017-08-08 | $1,142,681.50 | $930,195.00 |
| Rank 7of 8 | CONSTRUCT SIDEWALK | SAN PATRICIO | 2017-08-08 | $197,590.00 | $119,588.00 |
| Rank 6of 6 | TRANSPARENT NOISE WALL | DALLAS | 2017-08-08 | $1,623,610.00 | $1,109,507.00 |
| Rank 6of 12 | CLEARING AND GRUBBING | ANGELINA | 2017-07-12 | $1,631,689.75 | $890,456.22 |
| Low bidof 4 | INSTALL PROTECTION | DALLAS | 2017-07-12 | $3,522,310.63 | $3,522,310.63 |
| Rank 6of 6 | UPGRADE MBGF, SAFETY TREAT, PROFILE MARKERS | MASON | 2017-07-12 | $1,866,861.00 | $1,204,213.50 |
| Rank 7of 9 | CHANNEL IMPROVEMENTS | HUDSPETH | 2017-07-12 | $967,096.00 | $603,661.00 |
| Rank 7of 7 | RECONSTRUCT PARK ROAD INCLUDING PARKING LOTS | DALLAS | 2017-07-11 | $1,473,705.00 | $1,037,211.25 |
| Rank 8of 8 | SAFETY TREAT FIXED OBJECTS | WHARTON | 2017-07-11 | $3,391,633.20 | $1,947,826.26 |
| Rank 5of 6 | LANDSCAPE TREATMENT OF RIGHT OF WAY MEDIANS | DALLAS | 2017-06-07 | $2,659,748.75 | $1,750,000.00 |
| Rank 2of 3 | STRUCTURE IMPROVEMENTS | FAYETTE | 2017-04-26 | $391,516.50 | $293,197.00 |
| Rank 4of 7 | EROSION REPAIR | FANNIN | 2017-04-20 | $190,090.00 | $168,515.00 |
| Low bidof 4 | BRIDGE RAIL REPAIR | HUNT | 2017-04-20 | $190,925.00 | $190,925.00 |
| Rank 2of 4 | DRAINAGE REPAIR | SABINE | 2017-04-19 | $164,711.20 | $149,008.00 |
| Rank 5of 6 | RIPRAP & SCOUR REPAIR | HARRIS | 2017-04-11 | $267,202.93 | $160,886.67 |
| Rank 8of 9 | CROSS DRAINAGE STRUCTURE REPAIR | RED RIVER | 2017-04-04 | $773,613.00 | $478,007.80 |
| Rank 5of 5 | METAL BEAM GUARD FENCE UPGRADE | MONTAGUE | 2017-04-04 | $859,860.00 | $518,214.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.