Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
352 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 6of 7 | HAZARD ELIMINATION & SAFETY | LAMAR | 2021-05-05 | $2,357,927.50 | $1,748,082.48 |
| Rank 5of 5 | GUARDRAIL INSTALLATION AND REPAIR | ERATH | 2021-05-05 | $364,225.00 | $256,645.00 |
| Rank 2of 7 | RETAINING WALL REPAIR | LIBERTY | 2021-04-20 | $102,125.00 | $100,831.10 |
| Rank 3of 7 | BRIDGE STRUCTURE REPAIRS | TOM GREEN | 2021-04-14 | $241,370.50 | $239,260.00 |
| Rank 4of 5 | BRIDGE REPAIR | JEFFERSON | 2021-04-13 | $90,865.00 | $69,624.00 |
| Rank 4of 7 | SAFETY TREAT FIXED OBJECTS & RUMBLE STRIPS | BROWN | 2021-04-08 | $1,071,344.26 | $937,756.90 |
| Rank 3of 9 | CONCRETE REPAIRS | KIMBLE | 2021-04-08 | $557,465.50 | $498,855.00 |
| Rank 4of 6 | MISCELLANEOUS CONCRETE REPAIR | MCLENNAN | 2021-04-08 | $454,895.00 | $386,492.00 |
| Low bidof 6 | HAZARD ELIMINATION & SAFETY | ORANGE | 2021-04-07 | $403,662.00 | $403,662.00 |
| Rank 3of 7 | EROSION REPAIR | NUECES | 2021-03-23 | $350,382.00 | $275,821.50 |
| Rank 2of 5 | DRAINAGE IMPROVEMENT AND/OR REPAIRS | NUECES | 2021-03-23 | $282,516.00 | $278,753.05 |
| Rank 3of 6 | BRIDGE PREVENTATIVE MAINTENANCE | ARANSAS | 2021-03-23 | $271,290.00 | $216,750.00 |
| Rank 4of 6 | BRIDGE PREVENTATIVE MAINTENANCE | BEXAR | 2021-03-17 | $100,000.00 | $67,990.00 |
| Rank 7of 13 | RIPRAP REPAIR | ATASCOSA | 2021-03-17 | $110,224.00 | $99,804.00 |
| Low bidof 12 | BRIDGE SUBSTRUCTURE REPAIR | ATASCOSA | 2021-03-17 | $60,160.00 | $60,160.00 |
| Rank 2of 7 | BRIDGE REPAIR | HENDERSON | 2021-03-16 | $62,500.00 | $49,650.00 |
| Rank 4of 8 | BRIDGE REPAIR | HENDERSON | 2021-03-16 | $286,798.00 | $205,234.00 |
| Rank 7of 10 | BPM PROJECT | FAYETTE | 2021-03-05 | $876,275.00 | $629,249.50 |
| Rank 9of 10 | UPGRADE MBGF | MCLENNAN | 2021-03-04 | $2,220,943.87 | $1,857,024.50 |
| Rank 4of 7 | HAZARD ELIMINATION & SAFETY | RED RIVER | 2021-03-04 | $1,219,720.00 | $867,803.70 |
| Rank 5of 10 | EMBANKMENT STABILIZATION | MATAGORDA | 2021-02-05 | $82,150.00 | $57,975.10 |
| Rank 4of 13 | CROSS DRAIN STRUCTURES REPAIR OR REPLACEMENT | COLLIN | 2021-02-05 | $224,674.00 | $197,225.00 |
| Rank 3of 14 | MISCELLANEOUS BRIDGE REPAIR | HOWARD | 2021-02-04 | $464,756.00 | $425,867.00 |
| Rank 3of 7 | BRIDGE PREVENTIVE MAINTENANCE | HOUSTON | 2021-01-20 | $217,345.00 | $206,123.00 |
| Low bidof 8 | BRIDGE PREVENTATIVE MAINTENANCE | SHELBY | 2021-01-20 | $235,526.00 | $235,526.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.