Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
352 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 3of 4 | REPAIR AND MAINTENANCE OF MBGF | SAN AUGUSTINE | 2021-01-13 | $261,910.00 | $209,878.00 |
| Rank 2of 9 | CULVERT EXTENSION REPLACEMENT CROSS | ELLIS | 2021-01-12 | $214,670.00 | $200,250.00 |
| Rank 12of 13 | TREE TRIMMING AND BRUSH REMOVAL | DALLAS | 2021-01-12 | $162,350.00 | $103,579.00 |
| Low bidof 12 | MISCELLANEOUS CONCRETE REPAIR | ELLIS | 2021-01-12 | $235,572.50 | $235,572.50 |
| Rank 2of 10 | BRIDGE PREVENTATIVE MAINTENANCE | BOSQUE | 2021-01-08 | $210,381.50 | $173,337.60 |
| Rank 2of 9 | HAZARD ELIMINATION & SAFETY | HUNT | 2021-01-07 | $669,497.80 | $636,886.78 |
| Low bidof 6 | CLEAN/SEAL JOINTS/EROSION CNTRL/CONC REP | NEWTON | 2021-01-07 | $303,665.00 | $303,665.00 |
| Rank 5of 8 | GUARDRAIL REPAIR & INSTALLATION | WISE | 2021-01-07 | $924,830.00 | $848,007.00 |
| Rank 3of 9 | RETAINING WALL AND DRAINAGE REPAIR | HARRIS | 2021-01-07 | $379,527.00 | $323,749.50 |
| Rank 3of 5 | REPAIR AND MAINTENANCE OF MBGF | SAN JACINTO | 2021-01-06 | $227,365.00 | $221,530.00 |
| Rank 3of 9 | CLEAN & SEAL JOINTS/EROSION CNTRL/CONC REPAIR | CHAMBERS | 2021-01-06 | $75,045.00 | $72,198.00 |
| Rank 7of 11 | BPM-ABUTMENT AND RIPRAP EROSION REPAIR | GRAYSON | 2020-12-17 | $196,478.00 | $137,293.00 |
| Rank 3of 8 | BPM - ABUTMENT AND RIPRAP EROSION REPAIR | LAMAR | 2020-12-17 | $241,341.00 | $177,715.40 |
| Rank 8of 16 | SCOUR REPAIR | BRAZOS | 2020-12-17 | $318,410.00 | $204,920.00 |
| Rank 13of 13 | STONE RIP RAP AND SCOUR COUNTERMEASURES | MILAM | 2020-12-17 | $310,617.00 | $72,031.20 |
| Rank 3of 4 | REHABILITATION OF A BRIDGE FACILITY | MAVERICK | 2020-12-16 | $243,800.00 | $161,400.00 |
| Low bidof 5 | BRIDGE RAIL REPAIR | GREGG | 2020-12-08 | $39,735.00 | $39,735.00 |
| Rank 3of 4 | BPM - BRIDGE REPAIR | NAVARRO | 2020-12-08 | $166,435.00 | $143,114.00 |
| Rank 6of 9 | REPLACE GUARDRAIL | VAN ZANDT | 2020-12-03 | $7,219,204.25 | $3,660,941.00 |
| Rank 7of 11 | DITCH REGRADING | TRAVIS | 2020-12-03 | $611,154.00 | $312,894.56 |
| Rank 11of 15 | 2021 BRIDGE PREVENTATIVE MAINTENANCE | COTTLE | 2020-12-03 | $545,530.00 | $359,682.00 |
| Rank 12of 14 | BPM - BRIDGE REPAIRS | COLLIN | 2020-12-03 | $513,050.00 | $348,405.00 |
| Rank 4of 8 | BRIDGE FACILITIES CLEAN/RESEAL EXPANSION JOINTS | LASALLE | 2020-12-03 | $501,170.00 | $396,494.64 |
| Rank 3of 9 | BRIDGE PREVENTIVE MAINTENANCE | MCLENNAN | 2020-12-03 | $641,359.20 | $623,661.40 |
| Rank 4of 9 | MISCELLANEOUS CONCRETE REPAIR | DALLAS | 2020-12-02 | $436,050.00 | $404,070.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.