Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
352 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 10of 10 | SAFETY IMPROVEMENT PROJECTS | BASTROP | 2020-09-03 | $802,507.50 | $525,219.22 |
| Rank 2of 6 | MISCELLANEOUS BRIDGE REPAIR | EASTLAND | 2020-09-03 | $862,300.00 | $614,196.70 |
| Rank 4of 8 | BRIDGE PREVENTATIVE MAINTENANCE | WILLIAMSON | 2020-08-11 | $103,964.00 | $89,550.20 |
| Rank 2of 5 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | PALO PINTO | 2020-08-06 | $2,700,523.00 | $2,574,902.00 |
| Rank 7of 10 | IMPROVE DRAINAGE, UPGRADE GUARD RAIL | SMITH | 2020-08-06 | $2,255,114.00 | $1,833,547.83 |
| Rank 3of 3 | UPGRADE/IMPROVE GUARDRAIL | MCCULLOCH | 2020-08-06 | $761,375.00 | $657,372.75 |
| Rank 6of 8 | SIDEWALKS AND PEDESTRIAN BRIDGE | WOOD | 2020-08-06 | $408,205.00 | $339,130.60 |
| Rank 2of 5 | REPLACE GUARDRAIL | WOOD | 2020-08-06 | $779,481.00 | $777,778.60 |
| Rank 2of 6 | REPLACE GUARDRAIL | HENDERSON | 2020-08-05 | $1,437,507.50 | $1,420,616.00 |
| Rank 2of 5 | DISTRICT WIDE SAFETY TREATMENT UPGRADE | CHILDRESS | 2020-08-05 | $2,294,409.00 | $1,999,216.75 |
| Rank 5of 5 | BRIDGE MAINTENANCE | CAMERON | 2020-08-05 | $619,101.00 | $535,242.85 |
| Rank 7of 8 | UPGRADE GUARDRAIL | ARCHER | 2020-08-05 | $821,265.00 | $590,517.60 |
| Rank 3of 4 | SAFETY TREAT FIXED OBJECTS | BOSQUE | 2020-08-05 | $329,880.00 | $294,193.80 |
| Rank 4of 8 | CONSTRUCTION OF PEDESTRIAN SIDEWALKS & CURB RAMPS | ANGELINA | 2020-07-09 | $2,059,460.50 | $1,630,093.42 |
| Rank 4of 4 | SAFETY TREAT FIXED OBJECTS | FREESTONE | 2020-07-09 | $1,710,322.84 | $1,492,223.50 |
| Rank 3of 4 | LANDSCAPE & SCENIC ENHANCEMENT | TRAVIS | 2020-07-09 | $580,824.00 | $428,805.00 |
| Rank 4of 5 | HAZARD ELIMINATION & SAFETY | TARRANT | 2020-07-09 | $671,320.00 | $466,497.15 |
| Rank 5of 7 | PEDESTRIAN SIDEWALKS AND CURB RAMPS | HAYS | 2020-07-09 | $498,005.00 | $396,803.15 |
| Rank 4of 5 | TREE TRIM, BRUSH, DRIFTWOOD & DEBRIS REM | MCLENNAN | 2020-07-09 | $281,450.00 | $206,652.75 |
| Rank 2of 4 | SAFETY TREAT FIXED OBJECTS | FREESTONE | 2020-07-08 | $4,129,258.00 | $4,091,805.20 |
| Rank 3of 4 | LANDSCAPE | TAYLOR | 2020-07-08 | $463,345.00 | $326,023.97 |
| Rank 3of 3 | TREE TRIM, BRUSH REM, DRIFTWOOD & DEBRIS REMOVAL | HILL | 2020-07-08 | $506,920.00 | $362,572.00 |
| Rank 4of 6 | DEMOLITION OF EXISTING TIMBER STRUCTURE | ARANSAS | 2020-06-05 | $3,564,350.00 | $2,681,504.00 |
| Rank 3of 7 | FIXED OBJECT REPLACEMENT (MBGF) WITH SETS | WEBB | 2020-06-05 | $1,449,468.00 | $831,198.42 |
| Low bidof 3 | REMOVE AND REPLACE PEDESTRIAN RAIL ON OVERPASS | BELL | 2020-06-05 | $101,750.00 | $101,750.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.