Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
95 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 2of 7 | HAZARD ELIMINATION & SAFETY | WALLER | 2024-09-05 | $586,698.95 | $571,855.20 |
| Rank 4of 4 | INTERSECTION IMPROVEMENTS WITH TURN LANES | MILAM | 2024-08-02 | $3,538,445.75 | $3,193,316.70 |
| Low bidof 4 | CONSTRUCT TWO-WAY LEFT TURN LANE | MADISON | 2024-08-01 | $938,332.30 | $938,332.30 |
| Low bidof 4 | TRAFFIC SIGNAL IMPROVEMENTS | WASHINGTON | 2024-08-01 | $522,512.60 | $522,512.60 |
| Rank 2of 6 | BRIDGE REPLACEMENT | GRIMES | 2024-06-06 | $12,700,646.59 | $12,337,845.25 |
| Rank 3of 6 | INTERSECTION IMPROVEMENTS W/ RT AND/OR LT TRN LANE | GRIMES | 2024-06-05 | $11,938,490.85 | $10,784,375.49 |
| Rank 7of 10 | BRIDGE REPLACEMENT | MILAM | 2024-05-03 | $1,342,230.05 | $974,112.19 |
| Rank 9of 11 | INSTALL/UPGRADE DRAINAGE STRUCTURE(S) | MONTGOMERY | 2024-04-05 | $12,228,687.05 | $8,197,532.35 |
| Low bidof 5 | INTERSECTION IMPROVEMENTS W/ TURN LANES | WALKER | 2024-04-05 | $1,514,150.75 | $1,514,150.75 |
| Rank 4of 9 | HIGHWAY IMPROVEMENT | MONTGOMERY | 2024-02-02 | $3,442,108.41 | $3,167,865.70 |
| Rank 2of 8 | INTERSECTION IMPROVEMENTS WITH LEFT TURN LANE | WALKER | 2024-02-02 | $1,057,150.49 | $1,036,981.25 |
| Rank 2of 9 | BRIDGE REPLACEMENT | ROBERTSON | 2024-02-02 | $1,864,484.85 | $1,750,129.90 |
| Rank 4of 5 | RESURFACE ROADWAY | BASTROP | 2024-01-05 | $8,606,538.25 | $6,520,251.38 |
| Rank 3of 7 | SURFACING/ROADWAY RESTORATION | MONTGOMERY | 2023-08-03 | $2,047,778.44 | $2,012,093.41 |
| Low bidof 4 | WIDEN ROAD - ADD SHOULDERS | GRIMES | 2023-08-03 | $5,572,269.05 | $5,572,269.05 |
| Rank 2of 7 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | BASTROP | 2023-08-02 | $4,901,084.25 | $4,210,981.85 |
| Low bidof 4 | WIDEN ROAD - ADD LANES | ROBERTSON | 2023-08-02 | $4,456,784.39 | $4,456,784.39 |
| Rank 2of 8 | SURFACING/ROADWAY RESTORATION | MONTGOMERY | 2023-08-02 | $1,040,360.59 | $1,006,888.63 |
| Rank 2of 6 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | GRIMES | 2023-08-02 | $859,199.48 | $854,654.98 |
| Rank 2of 5 | REHABILITATE EXISTING ROADWAY | BRAZOS | 2023-06-28 | $10,869,225.05 | $9,980,813.57 |
| Low bidof 9 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | BRAZOS | 2023-06-27 | $4,034,958.95 | $4,034,958.95 |
| Rank 3of 7 | HOT MIX OVERLAY | MONTGOMERY | 2023-02-01 | $4,630,249.89 | $4,541,531.81 |
| Low bidof 4 | INSTALL RAISED MEDIAN | BRAZOS | 2021-12-02 | $4,137,992.91 | $4,137,992.91 |
| Rank 3of 6 | INTERSECTION IMPROVEMENTS WITH LEFT TURN LN | ROBERTSON | 2021-11-03 | $874,999.99 | $734,212.86 |
| Rank 3of 5 | INTERSECTION IMPROVEMENT | WASHINGTON | 2021-09-02 | $628,597.55 | $576,065.38 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.