Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
325 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 3of 5 | IH 10 BMIP (FY 2026) | EL PASO | 2025-09-05 | $6,161,334.60 | $4,508,215.72 |
| Rank 5of 10 | SH 214-NBI051850046106005-Parmer | PARMER | 2025-09-04 | $4,909,904.00 | $4,197,908.00 |
| Rank 2of 3 | US 90 PECOS RIVER BRIDGE | VAL VERDE | 2025-09-04 | $139,490.00 | $138,550.00 |
| Rank 5of 5 | Misc. Concrete Repair KRAO FY'25 | KAUFMAN | 2025-08-13 | $420,070.00 | $318,290.00 |
| Rank 3of 4 | Opaque Sealer Finish US75 | DALLAS | 2025-08-13 | $991,172.80 | $927,357.45 |
| Low bidof 3 | Opaque Sealer Finish 771 0825 | DALLAS | 2025-08-13 | $1,119,711.40 | $1,119,711.40 |
| Rank 7of 9 | 2026 - BPM WF Area | WICHITA | 2025-08-08 | $2,039,065.30 | $1,492,330.00 |
| Low bidof 7 | PR 22 Nueces Cathodic Protection BMIP | NUECES | 2025-07-02 | $1,759,250.97 | $1,759,250.97 |
| Rank 3of 9 | US 90 (@ HILLEBRANDT BAYOU)BRIDGE REHAB | JEFFERSON | 2025-07-01 | $5,998,740.10 | $5,167,739.54 |
| Rank 2of 6 | US 67 From US 67 SB at Wheatland Road | DALLAS | 2025-07-01 | $5,477,162.52 | $4,922,876.30 |
| Low bidof 11 | FY 26 BPM | JASPER | 2025-07-01 | $594,805.82 | $594,805.82 |
| Rank 4of 8 | BPM FY 2026 | POTTER | 2025-06-05 | $1,194,268.93 | $1,052,829.50 |
| Rank 3of 5 | US 90 PECOS RIVER BRIDGE | VAL VERDE | 2025-06-05 | $173,470.00 | $108,050.00 |
| Rank 3of 5 | FY 27 RR Bridges @ Various Locations | SMITH | 2025-05-02 | $3,159,054.10 | $2,796,332.40 |
| Rank 2of 4 | FY 25 Bridges @ Various Locations | SMITH | 2025-05-01 | $7,970,803.95 | $7,333,627.70 |
| Rank 3of 5 | US 85 BRIDGE REHAB (OVER BNSF RR YARD) | EL PASO | 2025-05-01 | $1,200,397.11 | $967,189.90 |
| Low bidof 6 | Steel Bridge Repair | DALLAS | 2025-04-09 | $337,964.60 | $337,964.60 |
| Rank 4of 5 | US 287 NB/FM 281 & RR BRG FY 25 BMIP | MOORE | 2025-04-04 | $4,481,822.30 | $3,547,551.90 |
| Rank 3of 3 | US 70 Bridge Repair | WILBARGER | 2025-03-13 | $157,890.00 | $112,028.00 |
| Low bidof 5 | LP 1 - 25BMIP | TRAVIS | 2025-02-07 | $720,110.11 | $720,110.11 |
| Rank 5of 5 | FY 25-DISTRICT WIDE-BRIDGE FUA | JEFFERSON | 2025-01-07 | $3,400,833.50 | $1,855,370.00 |
| Rank 3of 5 | REHABILITATE BRIDGE | TARRANT | 2024-11-07 | $5,952,823.06 | $5,157,489.52 |
| Rank 5of 10 | BRIDGE MAINTENANCE | SMITH | 2024-11-07 | $4,437,450.00 | $3,108,496.40 |
| Rank 3of 4 | REPAIR/REPLACE CONCRETE BARRIER | COLLIN | 2024-10-31 | $337,980.00 | $244,800.00 |
| Low bidof 3 | BRIDGE REPAIR | DALLAS | 2024-10-09 | $493,270.00 | $493,270.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.