Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
98 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 2of 2 | RECONSTRUCT URBAN ROADWAY | EASTLAND | 2018-05-02 | $22,800,240.11 | $16,887,011.55 |
| Rank 5of 7 | SAFETY_TREAT_FIXED OBJECTS_CONSTRUCT_PAVED SHDLRS | ELLIS | 2018-05-01 | $1,611,131.43 | $1,003,410.95 |
| Rank 2of 7 | REHABILITATE EXISTING ROADWAY | EASTLAND | 2018-04-04 | $3,294,538.11 | $3,213,022.12 |
| Low bidof 5 | ADD PASSING LANES | EASTLAND | 2018-04-03 | $4,526,012.96 | $4,526,012.96 |
| Low bidof 5 | BASE OVERLAY,2 COURSE SURF TRT, ACP | COMANCHE | 2018-03-07 | $5,024,304.05 | $5,024,304.05 |
| Low bidof 4 | GR, BS, DR, SC, PAVMT MARK | ERATH | 2018-03-06 | $5,937,214.70 | $5,937,214.70 |
| Rank 6of 7 | WDN, GR, SURF, ADD SHLDRS | HAMILTON | 2018-02-02 | $3,719,591.51 | $3,288,708.72 |
| Rank 2of 6 | ADD PASSING LANES | EASTLAND | 2018-02-02 | $3,679,630.50 | $3,673,746.04 |
| Rank 4of 5 | REHAB, WIDEN & OVERLAY | YOUNG | 2017-12-06 | $4,145,567.74 | $3,310,004.48 |
| Rank 5of 12 | DRAINAGE IMPROVEMENTS | STEPHENS | 2017-11-02 | $276,655.00 | $223,073.50 |
| Rank 2of 4 | GR, BS, DR, STR, PAV | TARRANT | 2017-10-04 | $1,872,864.65 | $1,869,823.09 |
| Rank 2of 8 | GR, BS AND PAVEMENT | HOOD | 2017-10-04 | $2,199,787.74 | $2,113,790.10 |
| Low bidof 4 | GRADING, PAVEMENT, STRIPING, & SIGN | PARKER | 2017-08-09 | $3,921,685.61 | $3,921,685.61 |
| Rank 2of 8 | SAFETY TREAT FIXED OBJECTS | TARRANT | 2017-08-09 | $307,268.95 | $281,936.15 |
| Rank 6of 9 | GR, STRS & SURF | HILL | 2017-07-11 | $77,471,466.28 | $63,963,884.91 |
| Rank 3of 4 | RESTORE EXISTING PAVEMENT | ELLIS | 2017-07-11 | $3,445,015.02 | $2,889,061.76 |
| Rank 2of 7 | GRADING,BASE,DRAINAGE,STRUCTURE,PAV | WISE | 2017-07-11 | $7,565,457.74 | $7,015,561.58 |
| Rank 4of 8 | GRADING, STRUCTURES AND PAVEMENT | PARKER | 2017-06-06 | $30,416,526.16 | $29,849,945.95 |
| Rank 4of 8 | RECONSTRUCT ROADWAY | EASTLAND | 2017-04-05 | $742,205.84 | $712,723.50 |
| Low bidof 8 | GR, BS, STRUC, AND PAVEMENT | HOOD | 2017-04-04 | $3,211,241.96 | $3,211,241.96 |
| Rank 5of 11 | REALIGN EXISTING ROADWAY | EASTLAND | 2017-03-08 | $83,919,830.87 | $76,238,256.10 |
| Rank 10of 11 | IMPRV GR, SFT TREAT OBJECTS, ADD PA | COLEMAN | 2017-01-05 | $2,575,171.98 | $1,678,694.17 |
| Rank 6of 7 | OFF SITE DRAINAGE REPLACEMENT | HOOD | 2017-01-04 | $4,030,381.15 | $2,899,083.65 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.