Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
19 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 9of 11 | SH 99 SB FR, Cinco Ranch Bl to Bay Hill | FORT BEND | 2026-07-01 | $24,432,000.00 | $19,505,917.99 |
| Rank 5of 6 | SH 146 (@ IH10-DUAL TURN LANES NB) | CHAMBERS | 2026-05-06 | $4,710,000.00 | $4,355,659.22 |
| Rank 12of 12 | FM 1314: N of SH 242 | MONTGOMERY | 2026-01-07 | $3,163,900.00 | $2,219,724.30 |
| Rank 5of 6 | SH 225 Mainlanes: SL 8 to Miller Cut Off | HARRIS | 2026-01-06 | $28,994,625.69 | $22,200,381.70 |
| Rank 3of 10 | SH 99, Longenbaugh to FM 529 (Seg E) | HARRIS | 2025-10-08 | $8,156,594.40 | $6,547,219.34 |
| Rank 5of 10 | City of La Marque Emancipation Trail | GALVESTON | 2025-08-07 | $2,355,237.77 | $1,983,177.10 |
| Rank 6of 6 | TRANSPORTATION NON-ROADWAY | HARRIS | 2024-12-03 | $1,805,000.00 | $1,523,997.55 |
| Rank 4of 5 | SURFACING/ROADWAY RESTORATION | LIBERTY | 2024-08-01 | $5,299,999.97 | $3,702,741.54 |
| Rank 11of 11 | INSTALL/UPGRADE DRAINAGE STRUCTURE(S) | MONTGOMERY | 2024-04-05 | $13,399,999.99 | $8,197,532.35 |
| Rank 4of 4 | HAZARD ELIMINATION & SAFETY | LIBERTY | 2024-04-05 | $5,270,000.00 | $3,983,905.56 |
| Rank 3of 9 | HIGHWAY IMPROVEMENT | MONTGOMERY | 2024-02-02 | $3,275,000.00 | $3,167,865.70 |
| Rank 3of 8 | INTERSECTION IMPROVEMENTS WITH LEFT TURN LANE | WALKER | 2024-02-02 | $1,093,000.00 | $1,036,981.25 |
| Rank 3of 4 | HIKE AND/OR BIKE | GALVESTON | 2023-11-01 | $7,650,000.00 | $7,167,628.34 |
| Rank 2of 5 | HIKE AND/OR BIKE | MONTGOMERY | 2023-10-06 | $4,649,999.99 | $4,077,635.10 |
| Rank 3of 4 | MILL AND INLAY | LIBERTY | 2023-06-28 | $3,830,000.00 | $3,176,353.60 |
| Rank 4of 4 | ASPHALT PAVEMENT WIDENING | CHAMBERS | 2023-06-28 | $1,689,000.00 | $1,219,731.95 |
| Rank 3of 6 | CONSTRUCT FRONTAGE ROADS | HARRIS | 2023-05-04 | $3,479,999.97 | $3,336,063.58 |
| Rank 3of 5 | HAZARD ELIMINATION & SAFETY | LIBERTY | 2023-04-05 | $5,988,000.00 | $4,870,507.63 |
| Rank 4of 5 | INSTALL TWO-WAY LT TURN LANE | GRIMES | 2023-04-05 | $2,628,999.99 | $2,060,026.16 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.