Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
346 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 3of 3 | MISCELLANEOUS CONCRETE REPAIR | ELLIS | 2017-07-11 | $474,006.50 | $248,095.00 |
| Rank 3of 7 | PVT REPAIR, SLOT STITCH | KAUFMAN | 2017-06-07 | $1,323,565.00 | $1,088,533.00 |
| Rank 2of 3 | CONCRETE FULL DEPTH REPAIR | DALLAS | 2017-06-07 | $882,578.95 | $674,379.67 |
| Low bidof 4 | REMOVE EXIST PVMNT,REPLC WITH CONC | TAYLOR | 2017-06-06 | $2,346,055.50 | $2,346,055.50 |
| Rank 7of 8 | INTALL MEDIAN BARRIER | WICHITA | 2017-06-06 | $1,413,358.48 | $1,167,403.50 |
| Low bidof 7 | PAVEMENT REPAIR & PAVEMENT MARKINGS | ROCKWALL | 2017-05-02 | $2,315,893.57 | $2,315,893.57 |
| Rank 5of 5 | FULL DEPTH CONCRETE REPAIR | NAVARRO | 2017-04-11 | $331,515.25 | $185,050.00 |
| Rank 8of 8 | CONSTRUCT SIDEWALKS & ADA CURB RAMPS | SMITH | 2017-04-05 | $273,476.50 | $97,066.00 |
| Low bidof 7 | MILL,FULL DEPTH REPAIR & OVERLAY ON FR RDS. | DALLAS | 2017-04-05 | $1,463,102.55 | $1,463,102.55 |
| Rank 7of 8 | CNSTR BIKE/ PED PATH | BROWN | 2017-03-08 | $546,204.20 | $427,889.98 |
| Rank 4of 9 | MISC. BRIDGE REPAIRS | CARSON | 2017-03-08 | $526,166.00 | $430,115.00 |
| Rank 7of 14 | CONC STRUCTURE REPAIR AND BRIDGE JOINTS | PECOS | 2017-03-08 | $469,032.50 | $318,869.50 |
| Low bidof 6 | FULL DEPTH CONCRETE REPAIR | COLLIN | 2017-03-07 | $657,809.00 | $657,809.00 |
| Low bidof 5 | FULL DEPTH CONCRETE REPAIR | POTTER | 2017-02-03 | $950,535.00 | $950,535.00 |
| Rank 4of 9 | MISCELLANEOUS BRIDGE REPAIRS | HOWARD | 2017-02-03 | $419,834.68 | $264,432.00 |
| Rank 2of 9 | MILL,CONC,REPAIR,OVERLAY | DALLAS | 2017-02-02 | $1,534,830.53 | $1,511,372.54 |
| Rank 3of 4 | FULL DEPTH CONCRETE REPAIR | MONTAGUE | 2017-02-02 | $775,862.00 | $758,517.00 |
| Rank 11of 11 | CONSTRUCT CURB RAMPS | CORYELL | 2017-01-04 | $1,216,224.00 | $663,079.06 |
| Rank 3of 4 | MISCELLANEOUS CONCRETE REPAIR | DALLAS | 2016-11-08 | $286,850.00 | $248,800.00 |
| Rank 4of 4 | MISCELLANEOUS CONCRETE REPAIR | DALLAS | 2016-11-08 | $327,875.00 | $253,810.00 |
| Rank 5of 5 | MISCELLANEOUS CONCRETE REPAIR | ROCKWALL | 2016-11-03 | $354,234.50 | $267,136.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.