Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
346 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Low bidof 4 | BS 121H Sam Rayburn Tollway to FM 2281 | DENTON | 2026-05-06 | $1,447,701.58 | $1,447,701.58 |
| Low bidof 2 | Van Horn- Rigid Pavement Repair | CULBERSON | 2026-05-05 | $1,917,794.00 | $1,917,794.00 |
| Rank 2of 3 | Rigid Pavement Repair EAO | EL PASO | 2026-05-05 | $1,998,075.00 | $1,650,378.00 |
| Low bidof 2 | RM 584 TRANSITION SLABS | TOM GREEN | 2026-04-16 | $762,302.00 | $762,302.00 |
| Rank 2of 6 | FY 26 RM 1061 OVERLAY | POTTER | 2026-04-07 | $7,598,853.11 | $7,487,324.30 |
| Low bidof 8 | FM 550 at Rabbit Ridge in Rockwall | ROCKWALL | 2026-04-07 | $2,341,216.75 | $2,341,216.75 |
| Rank 6of 6 | Misc Concrete Repair 07 03.26 | COLLIN | 2026-03-11 | $76,329.00 | $43,579.00 |
| Rank 2of 2 | SH18_FROM_15TH_TO_12TH | WARD | 2026-03-05 | $573,799.00 | $414,186.00 |
| Rank 12of 14 | 2026 District Wide ADA | SMITH | 2026-03-05 | $1,468,544.50 | $1,038,973.15 |
| Low bidof 4 | SH 171; Fr W Owen St to S of BB Fielder | PARKER | 2026-03-05 | $1,234,417.37 | $1,234,417.37 |
| Rank 4of 4 | Bundled Bid IH 635 East 771 0326 | DALLAS | 2026-03-05 | $2,452,775.54 | $755,724.84 |
| Rank 12of 12 | TASA FM 1306, FM 51 to Gainesville HS | COOKE | 2026-03-04 | $3,699,479.80 | $2,192,971.75 |
| Rank 2of 4 | On Call FDCR 07 02.26 | COLLIN | 2026-02-11 | $416,130.00 | $278,461.00 |
| Rank 2of 5 | FDCR Denton County FY 26 | DENTON | 2026-02-11 | $684,180.00 | $550,050.00 |
| Rank 4of 4 | 0077-01-032 US 67 Traffic Signal Improve | REAGAN | 2026-02-05 | $732,703.50 | $512,494.02 |
| Rank 7of 9 | BPM Joint Replacement 07 10.25 | COLLIN | 2026-01-14 | $118,140.00 | $53,876.00 |
| Rank 2of 4 | US 190 from US 87 to West Main Street | MCCULLOCH | 2026-01-07 | $1,549,739.00 | $1,459,866.01 |
| Rank 2of 3 | Full-Depth Concrete Repair 01 0126 | NAVARRO | 2026-01-07 | $1,343,525.00 | $1,224,500.00 |
| Low bidof 9 | IH 35W: Luella to Altamesa | TARRANT | 2026-01-06 | $3,872,523.74 | $3,872,523.74 |
| Rank 3of 5 | US 59 from SH 155 to Marion C/L | CASS | 2026-01-06 | $9,567,577.65 | $7,736,640.89 |
| Rank 4of 6 | Full Depth Concrete Repair 09 0126 | ELLIS | 2026-01-06 | $1,191,370.00 | $1,160,562.50 |
| Rank 6of 13 | FY 2026 - BPM S. Tarrant | TARRANT | 2026-01-06 | $1,185,275.00 | $960,310.00 |
| Rank 9of 9 | Repair/Replace CTB 1225 | NAVARRO | 2025-12-10 | $394,627.00 | $124,287.00 |
| Rank 7of 7 | R/R Concrete Barrier 07 12.25 | COLLIN | 2025-12-10 | $280,480.00 | $89,809.00 |
| Rank 4of 4 | FY26 Buffalo Curb Repair | LEON | 2025-12-09 | $225,265.00 | $79,657.64 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.