Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
346 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 6of 6 | US60-FM1172 to Castro CL FY27 HSIP | PARMER | 2026-10-06 | $2,605,040.34 | $1,696,791.55 |
| Rank 5of 5 | Concrete Punch Outs | VICTORIA | 2026-10-06 | $2,170,000.00 | $1,521,875.00 |
| Rank 2of 7 | FM2478 FDCR 07 09.26 | COLLIN | 2026-09-09 | $705,640.00 | $678,000.00 |
| Rank 2of 6 | SH 360; Arkansas Ln to SH 180 | TARRANT | 2026-09-03 | $4,914,580.25 | $4,581,050.10 |
| Low bidof 7 | US 287; FM 157 to Heritage Pkwy | TARRANT | 2026-09-02 | $2,623,266.87 | $2,623,266.87 |
| Rank 2of 2 | ON-CALL CONCRETE REPAIR FY27 | WICHITA | 2026-08-20 | $971,995.00 | $891,200.00 |
| Rank 11of 13 | FY27 BPM JOINTS IH-20 | GREGG | 2026-08-11 | $274,382.00 | $133,104.95 |
| Rank 3of 6 | Wildcatter Trail - Champions, Etc. | MIDLAND | 2026-08-06 | $2,518,338.60 | $2,075,905.00 |
| Low bidof 3 | CO Concrete Pavement Repair FY2027 | BOWIE | 2026-08-06 | $3,381,575.00 | $3,381,575.00 |
| Rank 7of 9 | Collins Blvd From Campbell Rd to Alma Rd | DALLAS | 2026-08-05 | $2,894,331.50 | $2,618,604.00 |
| Rank 3of 6 | IH 45 E of US 287 to Ellis County Line | NAVARRO | 2026-08-05 | $6,248,377.81 | $5,407,398.38 |
| Rank 3of 6 | Rigid Pavement Repair EAO/VH | EL PASO | 2026-08-05 | $2,206,050.00 | $1,772,400.00 |
| Rank 8of 9 | Bridge Joint Cleaning & Sealing 07 0726 | COLLIN | 2026-07-08 | $158,950.00 | $99,466.08 |
| Rank 6of 6 | SH 289 from SL 12 to IH 635 | DALLAS | 2026-07-02 | $6,972,856.41 | $5,963,494.65 |
| Low bidof 2 | Sept 26-Aug 27 Conc Full Depth Repair | TARRANT | 2026-07-02 | $4,900,925.00 | $4,900,925.00 |
| Low bidof 4 | 1.1 Mi W of SH 16 to SH 16 Pave Repair | EASTLAND | 2026-07-01 | $1,029,929.05 | $1,029,929.05 |
| Rank 3of 7 | Concrete Pavement Repair McLennan DW | HILL | 2026-07-01 | $1,584,152.50 | $1,432,275.00 |
| Rank 3of 6 | Site Specific FDCR FY27 | HOPKINS | 2026-07-01 | $1,791,672.00 | $1,650,050.00 |
| Low bidof 1 | FY27 Concrete Repair | TARRANT | 2026-06-30 | $678,974.00 | $678,974.00 |
| Rank 7of 7 | 0907-00-236 ADA Remediation | TOM GREEN | 2026-06-02 | $3,401,301.50 | $1,672,395.44 |
| Rank 2of 5 | FY 27 Concrete Pavement Repairs | WHEELER | 2026-06-02 | $880,255.00 | $847,645.00 |
| Rank 8of 8 | KingsvilleInterschool&Resd.Multi.Connect | KLEBERG | 2026-05-07 | $2,235,893.13 | $1,171,488.51 |
| Low bidof 5 | US 82, Kemp to US 287 | WICHITA | 2026-05-07 | $3,670,513.17 | $3,670,513.17 |
| Rank 8of 8 | Dallas District-Wide ADA Projects FY2026 | DALLAS | 2026-05-07 | $4,488,166.90 | $2,678,695.00 |
| Rank 3of 5 | SH 326(US 69-S/FM 1293)REHAB | HARDIN | 2026-05-06 | $1,752,705.99 | $1,527,726.75 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.