Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
95 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 6of 8 | 0907-26-005 CR REPLACE BRIDGE AND APPROA | SCHLEICHER | 2025-07-02 | $1,575,001.00 | $1,387,935.23 |
| Rank 4of 9 | Districtwide Sidewalk FY 2025 | BROWN | 2025-07-01 | $1,555,815.50 | $1,364,489.16 |
| Rank 8of 10 | CR 241: 0915-14-052; BR | WILSON | 2025-06-04 | $883,883.00 | $723,241.20 |
| Rank 2of 6 | ADA_REMEDIATION | ECTOR | 2025-06-04 | $1,288,450.00 | $1,271,684.30 |
| Low bidof 6 | 0922-00, Districtwide Upgrade Rail | WEBB | 2025-03-04 | $3,111,940.00 | $3,111,940.00 |
| Rank 6of 12 | FY25 BPM IH35/US90A/FM3009 | COMAL | 2025-02-20 | $175,187.00 | $100,463.00 |
| Rank 6of 13 | FY25 BPM FM 306 AT SUCHE AND POTTER CRK | COMAL | 2025-02-20 | $198,084.00 | $135,300.00 |
| Rank 7of 11 | FY25 BPM SH 41 AT DRAW/SH 16 AT DREAN CR | KERR | 2025-02-20 | $97,115.00 | $69,326.00 |
| Rank 7of 14 | Atascosa Bridge Preventative Maint | ATASCOSA | 2025-02-20 | $118,550.00 | $67,357.00 |
| Rank 2of 8 | 0907-13-017 CR REPLACE BRIDGE AND APPROA | RUNNELS | 2025-01-08 | $2,262,627.00 | $1,997,088.90 |
| Rank 2of 3 | IH10_NBI_06-222-0-0022-01-047 | TERRELL | 2025-01-07 | $3,801,865.20 | $3,731,413.10 |
| Rank 4of 7 | BRIDGE REPLACEMENT | GONZALES | 2024-12-04 | $3,675,248.50 | $2,979,227.43 |
| Low bidof 9 | BRIDGE REPLACEMENT | MILLS | 2024-12-03 | $1,470,000.00 | $1,470,000.00 |
| Low bidof 4 | BRIDGE REPLACEMENT | COLEMAN | 2024-10-02 | $1,097,424.00 | $1,097,424.00 |
| Rank 2of 6 | BRIDGE REPLACEMENT | COLEMAN | 2024-10-01 | $1,709,010.00 | $1,621,100.00 |
| Rank 5of 7 | BRIDGE REPLACEMENT | LAMPASAS | 2024-10-01 | $1,698,982.00 | $1,523,054.20 |
| Rank 3of 7 | BRIDGE REPLACEMENT | RUNNELS | 2024-10-01 | $1,706,772.20 | $1,527,290.16 |
| Rank 3of 5 | CULVERT | COKE | 2024-08-02 | $1,830,474.40 | $1,693,487.25 |
| Rank 4of 7 | BRIDGE REPLACEMENT | DUVAL | 2024-08-01 | $2,867,543.00 | $2,301,233.00 |
| Rank 2of 5 | BRIDGE REPLACEMENT | HOWARD | 2024-06-06 | $2,562,182.00 | $2,389,847.63 |
| Rank 2of 6 | BRIDGE REPLACEMENT | WEBB | 2024-06-05 | $4,900,920.00 | $4,378,549.92 |
| Rank 6of 9 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | WILSON | 2024-05-02 | $894,904.00 | $624,919.00 |
| Low bidof 2 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | VAL VERDE | 2024-03-05 | $1,810,443.00 | $1,810,443.00 |
| Low bidof 3 | BRIDGE REPLACEMENT | MIDLAND | 2024-01-04 | $3,896,638.50 | $3,896,638.50 |
| Low bidof 4 | BRIDGE REPLACEMENT | MITCHELL | 2023-12-05 | $1,415,995.00 | $1,415,995.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.