Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
15 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 2of 2 | Install of Milled-In Rumble Strips | HIDALGO | 2026-08-27 | $601,432.50 | $224,290.50 |
| Rank 2of 7 | IH 35; 0017-04-050; HSIP | ATASCOSA | 2025-09-04 | $617,498.87 | $582,833.82 |
| Rank 3of 5 | HAZARD ELIMINATION & SAFETY | HARRIS | 2021-08-04 | $1,386,863.43 | $1,273,417.93 |
| Rank 5of 5 | MILLING IN RUMBLE STRIPS | GONZALES | 2021-06-28 | $366,794.88 | $205,848.45 |
| Rank 4of 8 | PAVEMENT MARKINGS | HARRIS | 2021-04-07 | $329,925.97 | $262,181.48 |
| Low bidof 2 | INSTALL RUMBLE STRIPS ON VARIOUS ROADWAYS | HARRIS | 2020-08-06 | $3,056,780.62 | $3,056,780.62 |
| Rank 5of 6 | MILLED RUMBLE STRIPS | TOM GREEN | 2020-02-06 | $361,630.50 | $119,937.15 |
| Rank 7of 8 | HAZARD ELIMINATION & SAFETY | DIMMIT | 2019-12-04 | $698,967.45 | $492,119.55 |
| Low bidof 4 | INSTALLATION OF RUMBLE STRIPS | HILL | 2019-12-03 | $1,195,738.30 | $1,195,738.30 |
| Rank 2of 6 | MILLED EDGELINE RUMBLE STRIPS | CALLAHAN | 2019-02-05 | $1,390,537.97 | $1,298,584.91 |
| Low bidof 9 | MILLED EDGELINE & MILLED CENTERLINE RUMBLE STRIPS | GRAY | 2018-11-06 | $1,357,600.03 | $1,357,600.03 |
| Low bidof 4 | MILLED EDGELINE RUMBLE STRIPS | MONTAGUE | 2018-06-05 | $1,399,791.05 | $1,399,791.05 |
| Rank 3of 5 | MILLED EDGELINE RUMBLE STRIPS | BRISCOE | 2018-04-04 | $509,731.33 | $380,262.30 |
| Low bidof 4 | PROFILE EDGELINE MARKINGS | CALLAHAN | 2018-02-01 | $1,810,774.89 | $1,810,774.89 |
| Rank 2of 7 | RUMBLE STRIPS CENTER AND EDGE LINE | COCHRAN | 2017-08-09 | $1,074,432.57 | $1,040,662.59 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.