Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
208 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 4of 5 | REPLACEMENT OF EXISTING BRIDGE FACILITY | MOTLEY | 2018-08-08 | $2,889,739.09 | $2,119,655.50 |
| Low bidof 5 | THICK OVERLAY,JOINT REPAIR,MBGF,RUMBLE STRIPS | ROBERTS | 2018-06-06 | $13,340,741.71 | $13,340,741.71 |
| Low bidof 2 | REHABILITATION OF EXISTING ROAD | DONLEY | 2018-06-06 | $7,991,425.56 | $7,991,425.56 |
| Rank 2of 4 | WIDENING OF NON-FREEWAY FACILITY | MOTLEY | 2018-06-06 | $7,971,033.66 | $7,493,681.15 |
| Rank 4of 6 | OVERLAY,PVMT REPAIR,MBGF,RUMBLE STRIPS,STRIPING | DALLAM | 2018-05-02 | $10,859,704.47 | $10,092,335.71 |
| Low bidof 8 | REHABILITATION OF EXISTING ROADWAY | PARMER | 2018-05-01 | $17,450,676.08 | $17,450,676.08 |
| Low bidof 6 | REHABILITATION | CASTRO | 2018-04-04 | $15,741,046.83 | $15,741,046.83 |
| Rank 3of 6 | THICK OVERLAY,PAV REPAIR,SIGNS,BMGF,HSIP IMPROVE | MOORE | 2018-04-04 | $11,347,786.75 | $11,242,986.20 |
| Rank 4of 5 | REHABILITATION | HOCKLEY | 2018-04-03 | $10,554,667.11 | $7,499,584.14 |
| Rank 2of 3 | MOWING HIGHWAY ROW (URBAN) | POTTER | 2018-04-03 | $715,695.00 | $613,922.41 |
| Rank 3of 4 | PAVEMENT REPAIR, LEVEL-UP, OVERLAY | CROSBY | 2018-03-07 | $8,905,209.75 | $8,589,407.73 |
| Rank 7of 8 | REPLACE EXISTING BRIDGE AND APPROACHES | ROBERTS | 2018-02-02 | $2,802,854.85 | $2,093,931.75 |
| Rank 4of 6 | REHAB EXISTING ROADWAY | CARSON | 2018-02-02 | $11,772,973.12 | $10,873,603.31 |
| Rank 3of 5 | MISCELLANEOUS WORK | DONLEY | 2018-02-01 | $1,453,975.45 | $1,185,394.60 |
| Rank 6of 6 | REPLACE BRIDGE AND APPROACHES | GRAY | 2018-02-01 | $2,107,212.80 | $1,525,326.00 |
| Low bidof 4 | MISC ROADWAY REPAIRS | POTTER | 2017-12-05 | $4,503,545.00 | $4,503,545.00 |
| Rank 3of 4 | ASPHALTIC CONCRETE PAVEMENT OVERLAY | HALL | 2017-11-02 | $4,408,791.77 | $4,165,121.12 |
| Low bidof 5 | INTERSECTION & SAFETY IMPROVEMENTS ADDING TRUN LNS | POTTER | 2017-11-02 | $1,771,160.83 | $1,771,160.83 |
| Rank 2of 8 | FULL DEPTH RECLAMATION,PLANING,HOTMIX&PAV MARKINGS | CARSON | 2017-10-04 | $11,217,248.60 | $11,057,967.43 |
| Low bidof 5 | REHABILITATION OF EXISTING ROAD | COLLINGSWORTH | 2017-09-07 | $4,173,323.91 | $4,173,323.91 |
| Rank 2of 4 | CONSTRUCT INTERCHANGE,MAINLANES AND FRT ROADS | RANDALL | 2017-07-12 | $51,335,927.02 | $42,375,492.33 |
| Rank 7of 8 | THE REPLACEMENT OF A BRIDGE FACILITY | HALL | 2017-07-11 | $778,751.60 | $557,176.20 |
| Low bidof 5 | BRIDGE REPLACEMENT | POTTER | 2017-06-06 | $1,333,510.55 | $1,333,510.55 |
| Rank 3of 4 | SMA OVERLAY | LYNN | 2017-04-05 | $955,803.88 | $754,509.86 |
| Rank 5of 5 | REPLACE BRIDGES,FRT RD IMPROVE,REHAB TRAF SIGNALS | POTTER | 2017-04-05 | $9,008,870.72 | $7,472,229.70 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.