Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
201 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 2of 2 | MATERIALS ONLY | CALLAHAN | 2020-04-16 | $361,000.00 | $268,964.00 |
| Rank 2of 3 | MATERIALS ONLY | FISHER | 2020-04-16 | $65,650.00 | $49,380.50 |
| Rank 2of 3 | HOT MIX (MATERIALS ONLY) | BAYLOR | 2020-04-07 | $164,000.00 | $158,328.00 |
| Rank 2of 3 | HOT MIX (MATERIALS ONLY) | WICHITA | 2020-04-07 | $207,898.00 | $206,796.00 |
| Low bidof 2 | MATERIALS ONLY: FLEXIBLE BASE | HASKELL | 2020-03-31 | $4,800.00 | $4,800.00 |
| Rank 3of 7 | PAVEMENT REPAIR AND OVERLAY | CLAY | 2020-03-05 | $1,986,078.51 | $1,945,126.66 |
| Rank 2of 6 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH | CLAY | 2020-02-06 | $4,652,222.34 | $4,202,296.72 |
| Low bidof 1 | REHAB BRIDGE APPROACH AND DEPARTURE PAVEMENT | WICHITA | 2019-11-06 | $2,552,811.48 | $2,552,811.48 |
| Rank 2of 3 | PROVIDE FLEXIBLE BASE (MATERIAL ONLY) | COMANCHE | 2019-10-22 | $100,000.00 | $76,000.00 |
| Rank 2of 2 | SAFETY TRT FXD OBJ, ADDL SURF WIDTH, RUMBLE STRIPS | CLAY | 2019-08-06 | $2,225,483.33 | $2,211,991.09 |
| Low bidof 4 | REHABILITATE EXISTING SHOULDERS AND OVERLAY | CLAY | 2019-05-07 | $1,041,710.84 | $1,041,710.84 |
| Low bidof 2 | OVERLAY | ARCHER | 2019-04-03 | $7,554,037.74 | $7,554,037.74 |
| Rank 2of 2 | MILL AND OVERLAY | WILBARGER | 2019-04-02 | $7,274,355.74 | $6,884,724.00 |
| Rank 5of 5 | LEVEL UP AND OVERLAY | YOUNG | 2019-01-09 | $2,993,451.44 | $2,678,507.13 |
| Low bidof 2 | MILL AND OVERLAY | WICHITA | 2019-01-08 | $6,221,093.62 | $6,221,093.62 |
| Rank 3of 5 | ASPHALTIC CONCRETE PAVEMENT OVERLAY | KING | 2018-09-06 | $3,508,009.78 | $3,231,944.54 |
| Rank 3of 3 | FULL DEPTH REPAIR AND OVERLAY | THROCKMORTON | 2018-06-06 | $3,731,053.81 | $3,381,084.97 |
| Low bidof 3 | MILL & OVERLAY | WICHITA | 2018-06-06 | $8,831,585.37 | $8,831,585.37 |
| Low bidof 4 | ASPHALTIC CONCRETE PAVEMENT OVERLAY | KNOX | 2018-02-02 | $6,559,485.05 | $6,559,485.05 |
| Low bidof 4 | ASPHALTIC CONCRETE PAVEMENT OVERLAY | DICKENS | 2017-12-06 | $2,645,236.16 | $2,645,236.16 |
| Low bidof 1 | OVERLAY | THROCKMORTON | 2017-12-06 | $1,743,252.56 | $1,743,252.56 |
| Low bidof 4 | REHABLITATION OF EXISTING ROADWAY | KING | 2017-12-06 | $4,186,076.22 | $4,186,076.22 |
| Rank 3of 3 | SPOT MILL, BASE REPAIR & OVERLAY | YOUNG | 2017-11-03 | $1,297,009.94 | $1,069,536.55 |
| Rank 5of 11 | ACP OVERLAY | COMANCHE | 2017-10-03 | $1,060,758.64 | $918,207.81 |
| Rank 8of 9 | FULL DEPTH REPAIR AND OVERLAY | MONTAGUE | 2017-04-05 | $6,852,068.54 | $4,894,838.28 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.