Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
561 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 7of 9 | MILL,CONC,REPAIR,OVERLAY | DALLAS | 2017-02-02 | $1,906,900.97 | $1,511,372.54 |
| Rank 6of 7 | CL & SHLDR TEXTURING; PVMT MARKINGS | JACK | 2017-02-02 | $396,015.03 | $237,243.30 |
| Rank 3of 5 | MILLED CL RUMBLE STRIP | MCLENNAN | 2017-02-02 | $276,602.21 | $195,682.45 |
| Rank 6of 8 | CONSTRUCT WB 0 TO 2 LN FRONTAGE ROAD & RAMP MOD | DALLAS | 2017-01-05 | $4,300,861.68 | $3,939,023.45 |
| Rank 7of 7 | OFF SITE DRAINAGE REPLACEMENT | HOOD | 2017-01-04 | $4,215,582.45 | $2,899,083.65 |
| Low bidof 6 | GR, BS, ASPHALT PAV, PAV MK, SIGN | TARRANT | 2017-01-04 | $1,173,740.01 | $1,173,740.01 |
| Rank 3of 6 | WIDEN EXISTING MAINLANES FROM 4 TO 6 LANES | ORANGE | 2016-11-04 | $14,553,472.28 | $12,418,604.49 |
| Rank 8of 10 | GR, BS, STR & STRIPING | TARRANT | 2016-11-03 | $11,193,424.14 | $9,048,794.43 |
| Rank 4of 9 | REPLACE BRIDGES AND APPROACHES | TARRANT | 2016-11-03 | $2,920,824.06 | $2,474,990.19 |
| Rank 3of 7 | GR,BS,DR,STR AND PAV | TARRANT | 2016-11-03 | $4,632,342.61 | $4,196,348.59 |
| Rank 3of 10 | CONST 2 LANES OF ULT 4 LANE DIVIDED HWY | HUNT | 2016-11-03 | $7,724,055.24 | $7,109,675.99 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.