Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
561 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 2of 10 | BPM FY 2027 | POTTER | 2026-06-03 | $1,384,913.10 | $1,256,310.30 |
| Rank 2of 9 | US 87 NBI 05-219-0-0067-03-135 | SWISHER | 2026-06-03 | $2,868,974.00 | $2,742,796.00 |
| Rank 8of 9 | BMN | Bridge Joint Repair Districtwide | MCLENNAN | 2026-06-03 | $5,987,991.25 | $3,058,058.00 |
| Rank 4of 8 | SH 174; Wicker Hill to Elk Dr | JOHNSON | 2026-06-02 | $21,055,631.20 | $19,812,334.00 |
| Rank 2of 6 | SS 366 Deck Plaza Structure Extension | DALLAS | 2026-06-02 | $96,805,148.10 | $93,868,232.48 |
| Low bidof 6 | FY 2026 BRIDGE MAINT (DISTRICTWIDE) | EL PASO | 2026-06-02 | $812,409.50 | $812,409.50 |
| Rank 4of 4 | SL12 SS 408 to West Fork Trinity River | DALLAS | 2026-06-02 | $20,731,700.75 | $19,588,668.19 |
| Rank 3of 5 | VA: 0915-00-283: BRG Repair District | BEXAR | 2026-06-02 | $6,856,704.50 | $4,555,821.00 |
| Rank 3of 8 | RM 620 - Colorado River (BMIP24) | TRAVIS | 2026-06-02 | $3,780,923.00 | $3,335,184.39 |
| Rank 4of 7 | Sergio Ivan Rodriguez Pedestrian Bridge | HARRIS | 2026-06-02 | $6,087,015.41 | $4,349,108.00 |
| Rank 7of 7 | SH 360 NBFR: At AVE J | TARRANT | 2026-06-02 | $2,118,938.15 | $1,177,759.00 |
| Rank 2of 4 | SH 361 Nueces HarborIsland Blk Rmps PH I | NUECES | 2026-05-07 | $45,629,054.00 | $41,937,000.00 |
| Rank 2of 3 | IH 35E IH 20 to Ann Arbor Ave | DALLAS | 2026-05-07 | $11,682,456.83 | $11,542,445.93 |
| Rank 3of 14 | BRIDGE BMIP US 83 SB @ BU 84 UPRR | TAYLOR | 2026-05-07 | $4,206,128.00 | $4,004,004.00 |
| Rank 3of 8 | IH 45 at McKinney Ramp | HARRIS | 2026-05-07 | $4,353,529.00 | $3,899,831.00 |
| Low bidof 3 | SH302_MarianDriveTurnLanes | ECTOR | 2026-05-07 | $1,275,100.00 | $1,275,100.00 |
| Rank 3of 6 | FM 157; US 67 TO 8TH ST. | JOHNSON | 2026-05-06 | $18,997,827.84 | $17,138,490.71 |
| Rank 5of 7 | SS3 Nueces Ocean Drive Cayo Del Oso BR | NUECES | 2026-05-06 | $17,943,556.12 | $14,868,485.21 |
| Rank 2of 5 | OVERLAY_SH302_SH158_SL338 | ECTOR | 2026-05-06 | $11,138,756.63 | $9,284,543.47 |
| Rank 10of 13 | US 83 SB @ Salt Fork of Red River | COLLINGSWORTH | 2026-05-06 | $3,243,482.95 | $2,396,525.55 |
| Low bidof 5 | Yorktown Rd Nueces Cayo Del Oso BRG | NUECES | 2026-04-08 | $21,281,902.03 | $21,281,902.03 |
| Rank 4of 5 | FM1208_FM1212_MIDLAND_C/L | MARTIN | 2026-04-08 | $12,578,785.25 | $9,373,792.34 |
| Low bidof 4 | SH 35 BRIDGE REPLACEMENT 2712 | JACKSON | 2026-04-08 | $25,784,014.85 | $25,784,014.85 |
| Rank 2of 2 | 0017-10-294: IH 35 Downtown Pump Station | BEXAR | 2026-04-08 | $39,838,290.50 | $32,786,222.60 |
| Rank 5of 7 | SH 10 from West Park Dr to SH 183 | TARRANT | 2026-04-08 | $6,789,347.23 | $5,358,724.17 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.