Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
608 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 7of 7 | REHABILITATION OF EXISTING ROAD | FANNIN | 2019-11-06 | $5,098,473.62 | $3,715,011.16 |
| Rank 5of 6 | EROSION REPAIR | SAN JACINTO | 2019-11-06 | $2,097,892.50 | $1,582,884.50 |
| Rank 2of 3 | CALLOUT BRIDGE PREVENTATIVE MAINTENANCE | BOWIE | 2019-11-05 | $2,678,000.00 | $2,098,950.00 |
| Rank 2of 4 | EROSION REPAIR | POLK | 2019-11-05 | $564,913.00 | $466,419.50 |
| Rank 5of 6 | 10-FOOT WIDE SHARED USE PATH ON RAILBANKED CORRIDO | RED RIVER | 2019-10-03 | $887,536.25 | $690,833.65 |
| Rank 5of 5 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | HUNT | 2019-10-03 | $337,151.00 | $167,672.90 |
| Low bidof 6 | METAL BEAM GUARD FENCE AND MOWSTRIP | BOWIE | 2019-10-03 | $1,386,252.75 | $1,386,252.75 |
| Rank 2of 2 | PLANE ACP, CEMENT TREATMENT, ACP SURF, & PAV MARK | HARRISON | 2019-10-02 | $13,720,538.56 | $13,662,269.83 |
| Rank 4of 5 | PLANING, PAVEMENT REPAIR, OCST, OVRLY, PV MK | WOOD | 2019-10-02 | $1,668,053.65 | $1,442,127.50 |
| Rank 3of 5 | 10-FOOT WIDE SHARED USE PATH ON RAILBANKED CORRIDO | LAMAR | 2019-10-02 | $1,779,177.99 | $1,331,649.70 |
| Rank 5of 6 | 10-FOOT WIDE SHARED USE PATH ON RAILBANKED CORRIDO | RED RIVER | 2019-10-02 | $1,518,465.65 | $941,217.04 |
| Rank 4of 6 | REPL BR & APPRS | FALLS | 2019-10-02 | $434,444.08 | $362,831.10 |
| Low bidof 3 | CEMENT TREAT,FLEX BASE,SURFACING & PAVEMENT MARKS | UPSHUR | 2019-10-02 | $8,411,111.00 | $8,411,111.00 |
| Rank 3of 4 | SHLDR WIDEN, GRADING, PVT, DRNG, SIGNS, PV MK | HENDERSON | 2019-09-06 | $12,645,422.30 | $12,138,162.77 |
| Rank 2of 4 | CULVERT REPLACEMENT - DISTRICTWIDE | PANOLA | 2019-09-06 | $474,746.50 | $472,593.00 |
| Rank 6of 6 | BRIDGE PREVENTATIVE MAINTENANCE | SAN AUGUSTINE | 2019-09-06 | $1,081,750.00 | $718,542.00 |
| Rank 3of 3 | PLANING, BS RPR, ACP BS, OCST, PFC SUR, MBGF,PV MK | RUSK | 2019-09-05 | $7,564,715.14 | $7,308,695.21 |
| Rank 4of 4 | BS RPR,TRT SUBGRD,ACP,OCST,PFC SURF,STRS,PV MK | SMITH | 2019-08-07 | $9,496,441.46 | $8,695,777.00 |
| Rank 3of 3 | PLANING,PV RPR,OCST,SIDEWALK, PED FACILITY, PV MK | GREGG | 2019-08-07 | $3,266,555.51 | $3,110,849.34 |
| Rank 2of 6 | HAZARD ELIMINATION & SAFETY | FRANKLIN | 2019-08-07 | $871,861.75 | $801,629.40 |
| Rank 2of 2 | MILL AND INLAY | SHELBY | 2019-08-07 | $1,551,046.75 | $939,778.32 |
| Rank 2of 2 | PLN,SPRPV BS,OCST,PFC SURF,BRG RAIL,MBGF,PV MK | RUSK | 2019-08-06 | $6,632,252.76 | $6,403,500.83 |
| Rank 5of 6 | REHABILITATE EXISTING ROADWAY | FANNIN | 2019-08-06 | $3,725,248.71 | $3,077,922.85 |
| Rank 3of 7 | BRIDGE MAINTENANCE | SHELBY | 2019-08-06 | $3,770,872.20 | $3,364,209.01 |
| Rank 5of 6 | SIDEWALKS, DRIVEWAYS, DRNG, STRS, PV MK | CHEROKEE | 2019-08-06 | $699,377.00 | $502,100.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.