Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
608 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 4of 7 | UPGRADE MBGF | CAMP | 2018-10-03 | $1,033,357.50 | $934,655.00 |
| Rank 8of 8 | REHAB AND WIDEN EXISTING PAVMENT | HOUSTON | 2018-10-03 | $5,870,362.02 | $4,041,100.84 |
| Rank 6of 6 | MILL AND INLAY | HOUSTON | 2018-10-03 | $1,771,859.55 | $1,388,699.48 |
| Rank 4of 5 | REVERSE EXISTING RAMP CONFIGURATION | GRAYSON | 2018-10-02 | $2,864,878.91 | $2,328,633.32 |
| Rank 3of 3 | CROSS DRAINAGE STRUCTURE REPAIR | RAINS | 2018-09-20 | $185,230.00 | $165,494.00 |
| Rank 4of 5 | REHABILITATION OF EXISTING ROAD | HOPKINS | 2018-09-07 | $6,175,536.71 | $5,134,494.64 |
| Rank 4of 9 | GR,CMT TRT SBGRD,ACP,OCST,STRS,MBGF,PV MK | SMITH | 2018-09-07 | $3,291,175.59 | $3,017,503.37 |
| Rank 2of 3 | CALLOUT MILL & INLAY (SOUTH) | HARRISON | 2018-09-07 | $4,119,800.00 | $3,931,850.00 |
| Rank 6of 6 | MILL, OVERLAY & MRKINGS; BRIDGE RAIL REPLACE | KAUFMAN | 2018-09-06 | $7,798,737.74 | $6,161,838.27 |
| Low bidof 3 | CALLOUT MILL & INLAY (NORTH) | BOWIE | 2018-09-06 | $4,231,200.00 | $4,231,200.00 |
| Rank 5of 7 | BRIDGE REPLACEMENT | LAMAR | 2018-08-08 | $1,281,344.75 | $1,097,243.75 |
| Rank 7of 7 | PL,BS,SURF TRT,ACP,STRS,MBGF,SIGNS,PV MK | RUSK | 2018-08-08 | $10,718,663.84 | $7,676,966.96 |
| Rank 3of 4 | OVERLAY | HOPKINS | 2018-08-08 | $5,668,298.71 | $5,289,098.26 |
| Rank 4of 9 | HAZARD ELIMINATION & SAFETY | GRAYSON | 2018-08-07 | $3,974,473.50 | $3,461,445.00 |
| Rank 6of 6 | FLEX BASE, TCST, MILL & INLAY, PV MK | RUSK | 2018-08-07 | $2,115,188.35 | $1,667,776.70 |
| Rank 5of 8 | GR, BS, OCST, ACP SURF, STRS, PV MK | ANDERSON | 2018-07-11 | $2,938,773.60 | $2,573,741.95 |
| Rank 2of 4 | PFC SURF,BRG RAIL,MBGF,PVT MRKG | HENDERSON | 2018-07-11 | $1,234,950.20 | $1,161,999.49 |
| Rank 4of 8 | IMPROVE GUARDRAIL TO DES STANDARDS | ANGELINA | 2018-07-11 | $1,964,310.20 | $1,620,249.39 |
| Rank 9of 11 | REPLACE BRIDGE AND APPROACHES | KAUFMAN | 2018-07-11 | $3,581,556.35 | $2,718,727.83 |
| Rank 6of 7 | REHABILITATION OF EXISTING ROAD | LAMAR | 2018-07-11 | $5,614,925.64 | $4,044,598.86 |
| Rank 6of 6 | RECONSTRUCT, ADD SHOULDERS, AND TEXTURIZE ROADWAY | KAUFMAN | 2018-07-11 | $11,354,751.35 | $7,818,547.17 |
| Rank 4of 6 | GR, FLX BS, OCST, STRS, PVT MRK | SMITH | 2018-07-11 | $2,996,662.71 | $2,792,589.05 |
| Low bidof 3 | PLANING, ACP & PAVEMENT MARKINGS | MORRIS | 2018-07-11 | $7,028,104.55 | $7,028,104.55 |
| Rank 2of 3 | PLANING, PAVEMENT REPAIR, OCST, PV MK | SMITH | 2018-07-11 | $3,945,414.34 | $3,587,845.30 |
| Rank 2of 6 | BRIDGE REPAIR AND FULL DEPTH CONCRETE REPAIR | GRAYSON | 2018-07-11 | $934,740.00 | $876,910.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.