Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
608 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 5of 5 | WIDEN ROAD - ADD LANES | RUSK | 2023-01-05 | $3,671,102.82 | $2,429,718.64 |
| Rank 4of 5 | CONSTRUCT SIDEWALKS AND PEDESTRIAN CURB RAMPS | BOWIE | 2022-10-07 | $1,043,676.00 | $760,142.25 |
| Rank 9of 10 | BRIDGE PREVENTATIVE MAINTENANCE | CASS | 2022-10-07 | $932,710.00 | $606,935.00 |
| Rank 8of 11 | BRIDGE PREVENTATIVE MAINTENANCE | RUSK | 2022-10-06 | $845,585.00 | $471,298.00 |
| Rank 4of 4 | RESURFACE ROADWAY | RUSK | 2022-09-08 | $1,699,991.90 | $1,527,949.30 |
| Rank 2of 3 | WIDEN EXISTING 2-LANE HIGHWAY TO 4-LANE DIVIDED | PANOLA | 2022-09-07 | $29,582,265.99 | $29,546,263.07 |
| Rank 4of 4 | RESURFACE ROADWAY | GREGG | 2022-09-07 | $6,031,285.90 | $5,038,500.00 |
| Rank 5of 5 | RESURFACE ROADWAY | GREGG | 2022-09-07 | $5,460,480.06 | $4,533,082.58 |
| Rank 2of 2 | REHABILITATE EXISTING ROADWAY | TITUS | 2022-09-07 | $7,705,990.70 | $5,186,944.38 |
| Rank 2of 3 | MILL AND INLAY | GREGG | 2022-09-07 | $2,296,753.50 | $2,166,524.49 |
| Rank 4of 4 | HAZARD ELIMINATION & SAFETY | VAN ZANDT | 2022-08-04 | $4,874,148.05 | $3,629,409.25 |
| Rank 2of 2 | HAZARD ELIMINATION & SAFETY | RED RIVER | 2022-08-04 | $1,745,368.00 | $1,196,866.80 |
| Rank 2of 4 | WIDEN ROAD - ADD LANES | SMITH | 2022-08-03 | $45,161,963.13 | $44,362,526.75 |
| Rank 3of 4 | INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFT T | SMITH | 2022-08-03 | $2,583,560.00 | $2,208,247.24 |
| Rank 3of 3 | HAZARD ELIMINATION & SAFETY | LAMAR | 2022-08-03 | $1,755,755.50 | $1,434,042.00 |
| Rank 4of 4 | BRIDGE REPLACEMENT | HOPKINS | 2022-08-03 | $1,711,914.00 | $1,347,538.80 |
| Rank 3of 4 | WIDEN ROAD - ADD LANES | ANDERSON | 2022-06-30 | $63,868,868.68 | $55,487,305.16 |
| Low bidof 2 | RESURFACE EXISTING 4-LANE ROADWAY | CASS | 2022-06-29 | $11,842,462.04 | $11,842,462.04 |
| Rank 3of 4 | BRIDGE REPLACEMENT | HOUSTON | 2022-06-29 | $1,115,149.00 | $876,155.30 |
| Rank 4of 5 | BRIDGE REPLACEMENT | RED RIVER | 2022-06-29 | $1,396,254.05 | $1,091,166.37 |
| Rank 5of 6 | CROSS DRAINAGE STRUCTURE REPAIR | CHEROKEE | 2022-04-06 | $514,277.18 | $399,000.33 |
| Rank 7of 10 | BRIDGE MAINTENANCE | WOOD | 2022-03-04 | $2,588,093.87 | $2,199,787.24 |
| Rank 2of 2 | SURFACING/ROADWAY RESTORATION | GREGG | 2022-03-04 | $1,448,949.90 | $1,177,203.05 |
| Rank 5of 10 | REPLACE BRIDGE AND APPROACHES | HARRISON | 2022-03-04 | $523,799.25 | $481,045.30 |
| Rank 2of 4 | BRIDGE REPLACEMENT | GREGG | 2022-03-03 | $9,393,533.26 | $9,313,027.96 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.