Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
257 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Low bidof 6 | REPLACE BRIDGE AND APPROACHES | WALLER | 2020-08-05 | $559,763.20 | $559,763.20 |
| Rank 3of 4 | BRIDGE REPLACEMENT | HALE | 2020-07-08 | $513,133.00 | $436,230.00 |
| Rank 3of 4 | BRIDGE REPLACEMENT | SWISHER | 2020-05-08 | $2,363,894.00 | $1,543,187.50 |
| Rank 3of 5 | BRIDGE REPLACMENT | JONES | 2020-05-07 | $2,876,259.00 | $1,790,933.00 |
| Rank 2of 9 | BRIDGE PREVENTIVE MAINTENANCE | GARZA | 2020-05-07 | $706,810.00 | $517,184.80 |
| Rank 6of 9 | CULVERT REPLACEMENT | CLAY | 2020-05-07 | $970,977.50 | $619,585.36 |
| Rank 5of 5 | CONSTRUCTION OF SHARED USE PATH AND SIDEWALKS | PRESIDIO | 2020-04-09 | $995,644.20 | $531,477.00 |
| Rank 4of 5 | REPLACE EXISTING BRIDGES | HEMPHILL | 2020-03-05 | $24,862,757.00 | $16,941,869.76 |
| Low bidof 5 | ENCLOSE DRAINAGE DITCH | WICHITA | 2020-03-04 | $5,580,883.00 | $5,580,883.00 |
| Rank 2of 5 | REPLACE EXISTING LIFT STATION | CARSON | 2020-03-04 | $1,312,635.00 | $1,042,468.00 |
| Rank 2of 3 | BRIDGE REPLACEMENT | CLAY | 2019-12-04 | $3,447,536.00 | $3,436,318.50 |
| Rank 5of 5 | CULVERT REPLACEMENT | ARCHER | 2019-12-04 | $756,603.75 | $587,035.21 |
| Rank 3of 3 | RECONSTRUCT BRIDGE AND APPROACHES | SAN SABA | 2019-12-03 | $7,464,706.00 | $5,068,391.24 |
| Rank 2of 3 | TRANSPORTATION NON-ROADWAY | PRESIDIO | 2019-11-06 | $5,277,777.00 | $4,630,960.30 |
| Rank 2of 8 | BRIDGE REPLACEMENT | PALO PINTO | 2019-11-06 | $1,054,158.00 | $1,007,170.06 |
| Low bidof 6 | EROSION REPAIR | SAN JACINTO | 2019-11-06 | $1,582,884.50 | $1,582,884.50 |
| Rank 4of 6 | BRIDGE REPLACEMENT | WICHITA | 2019-10-03 | $1,954,447.00 | $1,584,998.82 |
| Rank 4of 6 | BRIDGE MAINTENANCE AND IMPROVEMENT | GARZA | 2019-09-05 | $1,762,267.80 | $1,306,629.40 |
| Rank 5of 5 | REPLACE BRIDGE AND APPROACHES | THROCKMORTON | 2019-08-06 | $2,567,472.20 | $2,072,676.59 |
| Rank 6of 6 | REMOVE AND REPLACE EXISTING BRIDGE AND APPROACHES | SCURRY | 2019-06-05 | $3,232,101.50 | $2,153,442.50 |
| Rank 3of 4 | REPLACE BRIDGE AND APPROACHES | CROCKETT | 2019-06-04 | $3,951,926.20 | $2,965,511.05 |
| Rank 6of 6 | REPLACE BRIDGE AND APPROACHES | BRAZORIA | 2019-05-08 | $4,088,021.70 | $2,849,523.73 |
| Rank 4of 4 | CONSTRUCT ONE WAY BRIDGE AND APPR | COLORADO | 2019-05-07 | $14,671,505.10 | $8,244,674.88 |
| Rank 2of 3 | REPLACE BRIDGE RAIL | POTTER | 2019-05-07 | $3,076,687.50 | $1,849,686.20 |
| Low bidof 5 | REPLACE EXISTING OFF SYSTEM BRIDGE | HANSFORD | 2019-04-03 | $1,745,583.16 | $1,745,583.16 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.