Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
916 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 3of 3 | FY 26 Jasper Tree and Brush Removal | JASPER | 2025-11-12 | $471,380.00 | $363,380.00 |
| Rank 7of 7 | FY 26 Bridge Rail Repair | WOOD | 2025-11-12 | $215,137.00 | $143,287.00 |
| Rank 3of 5 | MOWING HIGHWAY RIGHT OF WAY- BELL COUNTY | BELL | 2025-11-12 | $457,624.52 | $402,986.86 |
| Rank 4of 7 | Repair/Replace Concrete Barrier 09 1125 | ELLIS | 2025-11-12 | $671,414.00 | $408,528.00 |
| Rank 2of 5 | Mowing Highway Right of Way 09 0925 | ELLIS | 2025-11-12 | $230,500.00 | $230,459.50 |
| Rank 6of 9 | Tree Trimming and Brush Removal 09 1125 | ELLIS | 2025-11-12 | $326,695.00 | $222,280.00 |
| Rank 10of 10 | FY27 - Large Guide Sign -11 | BRAZOS | 2025-11-12 | $296,942.55 | $179,564.95 |
| Rank 3of 4 | FY26 - Walker Mowing -11 | WALKER | 2025-11-12 | $348,179.00 | $252,861.17 |
| Rank 7of 7 | FY26 Herbicide Johnson and HES | ERATH | 2025-11-06 | $3,342,722.00 | $1,187,971.00 |
| Rank 7of 7 | Herbicide Wise, Jack, Parker, Palo Pinto | WISE | 2025-11-06 | $4,297,688.00 | $1,748,008.30 |
| Low bidof 2 | Large Guide Sign 2025 (Non-Site) | DALLAS | 2025-11-05 | $2,084,886.00 | $2,084,886.00 |
| Rank 6of 6 | FY26 Tree Trimming South Tarrant | TARRANT | 2025-10-31 | $634,811.00 | $170,112.00 |
| Low bidof 6 | Large Sign Maintenance FY26 | MCLENNAN | 2025-10-23 | $310,048.00 | $310,048.00 |
| Rank 2of 7 | FY 26 SITE SPECIFIC BPM | ANDERSON | 2025-10-21 | $327,007.98 | $322,159.49 |
| Rank 3of 6 | FY 26 SITE SPECIFIC BPM NORTH | CHEROKEE | 2025-10-21 | $278,421.37 | $194,460.10 |
| Rank 3of 6 | 6489-48-001 Tree Trim. Brush Removal | KARNES | 2025-10-21 | $552,333.00 | $348,000.00 |
| Rank 3of 6 | 6490-30-001 RMC Tree Trimming | JIM WELLS | 2025-10-21 | $207,415.90 | $158,575.10 |
| Rank 3of 8 | Tree Trimming & Brush Removal FY '26 | KAUFMAN | 2025-10-15 | $313,975.00 | $189,350.11 |
| Rank 8of 9 | BPM Grayson FY26 | FANNIN | 2025-09-18 | $161,755.00 | $86,644.12 |
| Rank 11of 12 | Smith Co. FY 26 Tree Trimming | SMITH | 2025-09-16 | $433,496.51 | $188,686.00 |
| Rank 6of 12 | 2026 Bridge Preventative Maintenance | KENT | 2025-09-11 | $848,188.00 | $611,250.00 |
| Rank 5of 10 | Tree Trimming and Brush Removal 01 0925 | NAVARRO | 2025-09-10 | $143,446.00 | $127,261.00 |
| Rank 3of 4 | BTAO FY 26 Blanco Co. Mowing | BLANCO | 2025-09-10 | $302,608.00 | $240,522.76 |
| Low bidof 4 | Non SS Signal/Illumination | MCLENNAN | 2025-09-05 | $1,576,247.00 | $1,576,247.00 |
| Rank 7of 7 | US 79, GCAA 2023 | RUSK | 2025-09-05 | $256,618.34 | $119,461.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.