Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
102 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 3of 4 | DEBRIS REMOVAL - SOUTH | HARRISON | 2019-11-19 | $137,086.00 | $101,751.86 |
| Low bidof 3 | TREE TRIMMING | GREGG | 2019-11-12 | $254,767.84 | $254,767.84 |
| Rank 4of 6 | TREE TRIMMING | SMITH | 2019-11-12 | $197,713.00 | $170,639.50 |
| Rank 2of 2 | TREE TRIMMING - SOUTH | HARRISON | 2019-10-03 | $717,345.29 | $560,579.13 |
| Rank 3of 3 | TREE & STUMP REMOVAL (S) | HARRISON | 2019-09-06 | $1,121,754.00 | $554,654.00 |
| Rank 3of 4 | TREE AND STUMP REMOVAL (W) | UPSHUR | 2019-09-06 | $567,354.00 | $482,054.00 |
| Low bidof 2 | ROW MOWING | WOOD | 2018-12-11 | $281,485.45 | $281,485.45 |
| Rank 5of 5 | ROADSIDE MOWING | COMANCHE | 2018-05-14 | $370,393.92 | $255,057.37 |
| Rank 4of 4 | ROADSIDE MOWING | EASTLAND | 2018-05-14 | $364,176.00 | $323,712.00 |
| Rank 4of 5 | ROADSIDE MOWING | SAN SABA | 2018-05-14 | $264,358.16 | $194,895.14 |
| Rank 6of 6 | MOWING RIGHT OF WAY | CHILDRESS | 2018-05-02 | $659,100.00 | $364,431.60 |
| Rank 3of 5 | MOWING OF RIGHT WAY | DONLEY | 2018-05-02 | $702,019.36 | $497,840.88 |
| Rank 3of 5 | MOWING OF RIGHT WAY | DICKENS | 2018-05-01 | $658,044.20 | $577,497.80 |
| Low bidof 4 | CALLOUT CABLE SAFETY SYSTEM REPAIR | HARRISON | 2018-04-11 | $239,895.60 | $239,895.60 |
| Rank 2of 3 | MOWING HIGHWAY RIGHT OF WAY | HEMPHILL | 2018-04-04 | $491,075.44 | $422,718.64 |
| Rank 2of 3 | MOWING HIGHWAY RIGHT OF WAY | GRAY | 2018-04-04 | $558,743.78 | $499,464.67 |
| Rank 3of 4 | MOWING HIGHWAY RIGHT OF WAY | OLDHAM | 2018-04-03 | $443,488.00 | $351,059.52 |
| Rank 2of 2 | TREE TRIMMING - ATLANTA DISTRICTWIDE | TITUS | 2016-12-01 | $415,637.50 | $391,870.25 |
| Rank 3of 4 | FULL-WIDTH MOWING (TRACT 1-PANOLA) | PANOLA | 2016-11-16 | $197,676.00 | $174,371.04 |
| Rank 2of 3 | FULL WIDTH MOWING (TRACT 2 - MORRIS) | MORRIS | 2016-11-16 | $146,400.00 | $138,055.20 |
| Low bidof 4 | FULL WIDTH MOWING (TRACT 3 - UPSHUR) | UPSHUR | 2016-11-16 | $149,136.04 | $149,136.04 |
| Rank 2of 3 | FULL WIDTH MOWING (TRACT 4 - MARION) | MARION | 2016-11-16 | $131,010.00 | $126,206.30 |
| Low bidof 2 | FULL WIDTH MOWING (TRACT 6 - HARRISON) | HARRISON | 2016-11-16 | $144,325.00 | $144,325.00 |
| Rank 2of 4 | FULL WIDTH MOWING (TRACT 7-TITUS) | TITUS | 2016-11-16 | $179,924.00 | $175,200.00 |
| Rank 5of 6 | DEBRIS REMOVAL (NORTH) | BOWIE | 2016-11-16 | $55,500.00 | $35,705.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.