Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
180 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 3of 7 | FM 1960, FM 2100 to Liberty C/L | HARRIS | 2025-02-06 | $1,969,078.94 | $1,835,597.33 |
| Low bidof 6 | FM 1484, FM 2432 to SH 105 | MONTGOMERY | 2025-02-06 | $8,353,735.85 | $8,353,735.85 |
| Low bidof 3 | SH 288: SH 36 to Dow Drainage Canal | BRAZORIA | 2025-02-06 | $8,297,801.10 | $8,297,801.10 |
| Low bidof 6 | FM 526; North of US 90 to BU 90 | HARRIS | 2025-01-08 | $1,067,872.27 | $1,067,872.27 |
| Rank 2of 5 | FM 1485, Old Houston to Kidd Cemetery Rd | MONTGOMERY | 2025-01-07 | $8,749,305.28 | $8,172,669.33 |
| Rank 2of 2 | SH 87: Seawall to Ferry Boat Landing; OV | GALVESTON | 2025-01-07 | $7,797,943.95 | $7,342,374.25 |
| Low bidof 3 | FM 646: FM 517 to FM 646; OV | GALVESTON | 2025-01-07 | $7,395,778.28 | $7,395,778.28 |
| Rank 2of 6 | TRANSPORTATION NON-ROADWAY | HARRIS | 2024-12-03 | $1,557,772.00 | $1,523,997.55 |
| Rank 3of 4 | SURFACING/ROADWAY RESTORATION | GALVESTON | 2024-09-06 | $20,250,914.85 | $17,513,705.44 |
| Rank 3of 6 | SURFACING/ROADWAY RESTORATION | WALLER | 2024-09-06 | $2,560,935.79 | $2,461,983.97 |
| Rank 3of 3 | SURFACING/ROADWAY RESTORATION | HARRIS | 2024-08-02 | $24,770,751.25 | $18,279,582.41 |
| Low bidof 4 | SURFACING/ROADWAY RESTORATION | HARRIS | 2024-08-01 | $4,137,770.75 | $4,137,770.75 |
| Rank 2of 4 | SURFACING/ROADWAY RESTORATION | HARRIS | 2024-04-04 | $12,620,008.05 | $11,991,169.79 |
| Low bidof 5 | SURFACING/ROADWAY RESTORATION | FORT BEND | 2024-03-06 | $1,497,972.35 | $1,497,972.35 |
| Rank 4of 4 | SURFACING/ROADWAY RESTORATION | HARRIS | 2024-02-02 | $9,777,474.34 | $7,540,358.23 |
| Low bidof 5 | BASE REPAIR, 1.5" PLANING, 1.5" ACP OVERLAY | WALLER | 2024-01-05 | $4,087,471.73 | $4,087,471.73 |
| Rank 2of 4 | SURFACING/ROADWAY RESTORATION | HARRIS | 2024-01-04 | $12,330,493.88 | $10,229,817.06 |
| Low bidof 4 | SURFACING/ROADWAY RESTORATION | HARRIS | 2024-01-04 | $8,121,312.50 | $8,121,312.50 |
| Low bidof 3 | ASPHALT | FORT BEND | 2024-01-04 | $1,894,290.90 | $1,894,290.90 |
| Rank 4of 7 | ACP OVERLAY | WALLER | 2024-01-04 | $683,431.30 | $598,559.40 |
| Low bidof 3 | SURFACING/ROADWAY RESTORATION | GALVESTON | 2023-02-02 | $7,736,540.02 | $7,736,540.02 |
| Rank 5of 7 | HOT MIX OVERLAY | MONTGOMERY | 2023-02-01 | $5,133,072.70 | $4,541,531.81 |
| Rank 2of 3 | SURFACING/ROADWAY RESTORATION | BRAZORIA | 2023-02-01 | $4,983,455.71 | $4,976,855.49 |
| Rank 4of 4 | BASE REPAIR, OCST, 1.5" HMA LEVEL-UP AND 1.5" HMA | MONTGOMERY | 2022-08-04 | $12,193,971.64 | $10,866,955.64 |
| Low bidof 3 | SURFACING/ROADWAY RESTORATION | WALLER | 2022-08-04 | $13,133,459.07 | $13,133,459.07 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.