Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
180 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 3of 3 | SURFACING/ROADWAY RESTORATION | HARRIS | 2022-08-03 | $5,965,137.19 | $3,261,336.96 |
| Rank 3of 4 | SURFACING/ROADWAY RESTORATION | MONTGOMERY | 2022-06-30 | $5,383,930.10 | $4,740,080.60 |
| Low bidof 6 | BASE REPAIR, PLANING, SEAL COAT, 1.5" PFC OL | WALLER | 2022-03-04 | $3,607,335.29 | $3,607,335.29 |
| Low bidof 3 | SURFACING/ROADWAY RESTORATION | FORT BEND | 2022-03-04 | $2,089,681.98 | $2,089,681.98 |
| Low bidof 3 | SURFACING/ROADWAY RESTORATION | FORT BEND | 2022-03-03 | $4,238,148.20 | $4,238,148.20 |
| Low bidof 3 | SURFACING/ROADWAY RESTORATION | GALVESTON | 2022-02-04 | $4,384,915.81 | $4,384,915.81 |
| Rank 2of 2 | SURFACING/ROADWAY RESTORATION | HARRIS | 2022-02-03 | $2,368,967.00 | $2,335,520.61 |
| Rank 4of 4 | SURFACING/ROADWAY RESTORATION | MATAGORDA | 2022-01-06 | $8,449,767.94 | $6,659,956.19 |
| Low bidof 3 | BASE REPAIR, PLANING, ACP OVERLAY, MILLED RS | FORT BEND | 2021-12-01 | $1,393,431.98 | $1,393,431.98 |
| Rank 2of 2 | BASE REPAIR WITH SEAL COAT AND/OR OVERLAY | GALVESTON | 2021-10-07 | $3,007,007.85 | $2,973,968.35 |
| Rank 5of 5 | SURFACING/ROADWAY RESTORATION | WALLER | 2021-09-01 | $6,874,454.88 | $5,061,781.12 |
| Rank 3of 3 | HOT MIX | BRAZORIA | 2021-08-24 | $378,502.95 | $228,109.57 |
| Low bidof 3 | SURFACING/ROADWAY RESTORATION | HARRIS | 2021-08-05 | $8,982,210.95 | $8,982,210.95 |
| Rank 2of 2 | WIDEN SLDRS, ADD PASSING LN, LEVEL UP & SUPER PAVE | GALVESTON | 2021-08-04 | $7,366,291.34 | $7,147,856.63 |
| Rank 3of 3 | RESURFACE ROADWAY | BRAZORIA | 2021-07-01 | $5,595,476.42 | $5,272,928.80 |
| Low bidof 4 | PLANING, PAVEMENT REPAIR, SEAL COAT AND 1.5" ACP | BRAZORIA | 2021-04-08 | $1,417,776.23 | $1,417,776.23 |
| Low bidof 5 | ADD SHOULDERS, SEAL COAT AND 1.5 IN ACP OVERLAY | BRAZORIA | 2021-03-05 | $11,769,390.85 | $11,769,390.85 |
| Low bidof 4 | MILL, SEAL COAT AND 1.5 IN PFC OVERLAY | BRAZORIA | 2021-03-04 | $9,211,640.25 | $9,211,640.25 |
| Rank 3of 5 | BASE REPAIR, PLANING, SEAL COAT, PFC OVERLAY | WALLER | 2021-02-05 | $5,421,393.38 | $5,294,013.75 |
| Rank 2of 3 | 2.5 " PLANING, SEAL COAT, TOM OVERLAY | HARRIS | 2021-02-04 | $4,843,485.20 | $3,598,843.20 |
| Low bidof 4 | RESTORATION OF ROADWAY | HARRIS | 2021-02-04 | $969,114.40 | $969,114.40 |
| Low bidof 6 | PLANING, PAVEMENT REPAIR, SEAL COAT AND 1.5" HMA | BRAZORIA | 2021-02-04 | $858,674.28 | $858,674.28 |
| Rank 2of 5 | SURFACING/ROADWAY RESTORATION | HARRIS | 2021-01-07 | $1,759,892.09 | $1,616,649.76 |
| Rank 2of 5 | CONSTRUCTION OF SUPER 2 HIGHWAY | BRAZORIA | 2020-12-02 | $31,570,290.07 | $28,859,306.44 |
| Rank 3of 5 | SURFACING/ROADWAY RESTORATION | BRAZORIA | 2020-09-03 | $1,527,124.70 | $1,468,982.15 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.