| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Low bidof 3 | SC, LEVEL UP, W/ LP DETRS & O/L | BRAZORIA | 2018-03-06 | $2,395,790.47 | $2,395,790.47 |
| Low bidof 4 | ACP OVERLAY | MATAGORDA | 2018-03-06 | $1,521,680.37 | $1,521,680.37 |
| Rank 2of 2 | BASE REP, MILLING, SEAL COAT, O/L | GALVESTON | 2018-03-06 | $1,584,495.89 | $1,551,543.50 |
| Rank 2of 4 | BASE REPAIR AND OVERLAY | FORT BEND | 2018-02-02 | $799,453.13 | $781,727.27 |
| Rank 2of 2 | BS REP,MILL,O/L,STRIPING,CURB/SIDEWALK REPL W/TS | HARRIS | 2018-02-02 | $2,557,609.99 | $2,411,705.72 |
| Rank 2of 3 | PAVMT REPAIR AND ACP OVERLAY | BRAZORIA | 2018-02-01 | $1,587,296.86 | $1,534,308.55 |
| Rank 5of 6 | ACP OVERLAY | AUSTIN | 2017-11-03 | $1,344,491.98 | $1,151,604.59 |
| Rank 2of 6 | BASE REPAIR AND OVERLAY | FORT BEND | 2017-10-04 | $863,053.38 | $851,224.00 |
| Rank 4of 5 | ACP OVERLAY | WHARTON | 2017-07-12 | $9,148,980.32 | $8,161,719.84 |
| Rank 2of 2 | BASE REPAIR, MILL, SEAL COAT, & 1 INCH OVERLAY | HARRIS | 2017-07-11 | $3,096,328.54 | $3,070,707.87 |
| Rank 4of 6 | CONSTRUCT SUPER 2 LANES | COLORADO | 2017-06-07 | $5,047,737.79 | $4,487,326.99 |
| Rank 3of 3 | SPALL REP, FULL DEPTH REP, O/L, STRP | HARRIS | 2017-06-06 | $16,884,693.36 | $14,771,556.14 |
| Low bidof 3 | ADD LEFT TURN LANE | BRAZORIA | 2017-04-05 | $261,915.90 | $261,915.90 |
| Rank 4of 4 | PAVEMENT REPAIR AND SURFACING | WHARTON | 2017-04-05 | $2,052,047.82 | $1,713,209.17 |
| Rank 4of 5 | 1.5 INCH PLANING, 1.5 INCH ACP OVERLY, PAV MRKS | FORT BEND | 2017-04-04 | $616,747.60 | $563,996.22 |
| Rank 2of 2 | MILL, FULL DEPTH REP, O/L & STRIP | GALVESTON | 2017-04-04 | $1,031,550.72 | $985,671.81 |
| Rank 2of 3 | CONSTRUCT ACP RAMP | GALVESTON | 2017-03-08 | $423,571.84 | $318,156.25 |
| Rank 3of 3 | BASE REPAIR AND OVERLAY | FORT BEND | 2017-03-07 | $2,028,998.33 | $1,849,419.98 |
| Low bidof 2 | PAVEMENT REPAIR AND ACP OVERLAY | BRAZORIA | 2017-02-03 | $5,258,450.72 | $5,258,450.72 |
| Rank 2of 2 | SEAL COAT, 1 IN ACP OVERLAY AND PAVEMENT MARKINGS | HARRIS | 2017-02-03 | $1,935,439.08 | $1,494,920.90 |
| Rank 3of 11 | CONSTRUCT 4-LN DIVIDED ROADWAY | FORT BEND | 2017-02-03 | $4,087,406.98 | $3,825,527.24 |
| Low bidof 4 | BASE REPAIR AND 1.5" OVERLAY | FORT BEND | 2017-02-02 | $1,774,560.91 | $1,774,560.91 |
| Low bidof 3 | CONSTRUCT INTERSECTION IMPROVEMENTS | FORT BEND | 2017-01-05 | $1,107,205.60 | $1,107,205.60 |
| Rank 2of 3 | MILL, SEAL & PFC O/L | BRAZORIA | 2017-01-05 | $5,079,594.70 | $4,993,779.69 |
| Low bidof 3 | 3/4"TOM-F & 1"TOM-C,MILLING,SEAL COAT & STRIPPING | GALVESTON | 2017-01-04 | $564,892.18 | $564,892.18 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.