Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
632 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 2of 2 | FLEXIBLE BASE | PECOS | 2022-03-08 | $38,700.00 | $36,500.00 |
| Rank 2of 3 | ROCK/RIPRAP | POLK | 2022-03-08 | $35,000.00 | $32,000.00 |
| Low bidof 6 | CULVERT REPLACEMENT | TYLER | 2022-03-04 | $968,961.40 | $968,961.40 |
| Rank 2of 2 | SAFETY STRUCTURE WIDENING | HOPKINS | 2022-03-04 | $681,006.00 | $445,448.00 |
| Rank 2of 3 | BRIDGE REPAIR | TRAVIS | 2022-03-03 | $1,593,890.00 | $1,558,775.00 |
| Low bidof 2 | ROCK/RIPRAP | GREGG | 2022-03-03 | $657,700.00 | $657,700.00 |
| Rank 2of 2 | MATERIALS ONLY: HYDRAULIC CEMENT CONCRETE | HENDERSON | 2022-03-03 | $326,750.00 | $298,000.00 |
| Rank 2of 4 | BRIDGE PREVENTATIVE MAINTENANCE | LIBERTY | 2022-02-15 | $266,052.00 | $265,009.00 |
| Rank 2of 7 | SMALL SIGN REPLACEMENT | ECTOR | 2022-02-08 | $210,000.00 | $203,950.00 |
| Rank 3of 3 | DENSE GRADED HOT MIX | REEVES | 2022-02-08 | $396,000.00 | $296,475.00 |
| Rank 2of 2 | CONCRETE MATERIALS ONLY | FORT BEND | 2022-02-08 | $207,000.00 | $194,000.00 |
| Rank 3of 6 | REPAIR/REPLACE CONCRETE BARRIER | NAVARRO | 2022-02-08 | $320,830.00 | $295,394.00 |
| Rank 2of 4 | CULVERT EXTENSION & CROSS DRAINAGE | COLLIN | 2022-02-08 | $261,772.80 | $258,520.60 |
| Rank 3of 3 | ROCK/RIPRAP | CHAMBERS | 2022-02-08 | $60,000.00 | $50,000.00 |
| Rank 4of 5 | HAZARD ELIMINATION & SAFETY | TRAVIS | 2022-02-04 | $2,674,962.86 | $2,285,064.75 |
| Rank 2of 4 | SAFETY TREAT FIXED OBJECTS | NUECES | 2022-02-04 | $997,979.00 | $706,534.50 |
| Rank 3of 3 | DRAINAGE IMPROVEMENT AND/OR REPAIRS | ORANGE | 2022-02-04 | $2,476,602.60 | $2,379,716.00 |
| Rank 2of 3 | INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFT T | JACK | 2022-01-07 | $4,610,119.64 | $3,685,479.68 |
| Rank 2of 2 | DITCH CLEANING AND RESHAPING | HARRIS | 2022-01-07 | $1,502,885.50 | $718,629.63 |
| Rank 4of 4 | RAILROAD CROSSING IMPROVEMENTS | BROWN | 2022-01-06 | $4,646,454.80 | $3,046,555.05 |
| Rank 3of 5 | INSTALL/REPLACE SIGNS | WILLIAMSON | 2022-01-06 | $179,191.50 | $173,551.29 |
| Low bidof 3 | AGGREGATE | RUNNELS | 2021-12-21 | $141,496.00 | $141,496.00 |
| Low bidof 3 | FLEXIBLE BASE | WALKER | 2021-12-08 | $111,285.00 | $111,285.00 |
| Rank 6of 8 | BRIDGE REPAIR | LEON | 2021-12-07 | $260,126.00 | $167,760.00 |
| Low bidof 2 | FLEXIBLE BASE | BRAZOS | 2021-12-07 | $154,860.00 | $154,860.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.