Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
631 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 4of 4 | FLEXIBLE BASE COLLIN FY27 | COLLIN | 2026-08-12 | $58,640.00 | $42,400.00 |
| Rank 3of 4 | FY27 - District Cross Drainage -08 | BRAZOS | 2026-08-12 | $579,062.00 | $362,100.00 |
| Rank 4of 4 | ELP_SL0375_1-SYS (2022) | EL PASO | 2026-08-06 | $8,808,153.40 | $6,996,635.80 |
| Low bidof 3 | Cleaning and Sweeping Webb County | WEBB | 2026-08-06 | $1,786,303.40 | $1,786,303.40 |
| Rank 3of 3 | CO Concrete Pavement Repair FY2027 | BOWIE | 2026-08-06 | $4,299,250.00 | $3,381,575.00 |
| Rank 4of 6 | IH 45 E of US 287 to Ellis County Line | NAVARRO | 2026-08-05 | $6,899,718.21 | $5,407,398.38 |
| Low bidof 7 | US 290 at Cypress Creek | HARRIS | 2026-08-05 | $1,422,408.75 | $1,422,408.75 |
| Low bidof 2 | Sweeping and Debris Removal 09 07/26 | ELLIS | 2026-08-05 | $1,667,621.00 | $1,667,621.00 |
| Rank 4of 5 | 6497-47-001 GUARDRAIL | HARRIS | 2026-08-05 | $2,462,015.00 | $1,532,630.00 |
| Rank 3of 4 | FY27, Guard Rail, S Tarrant | TARRANT | 2026-08-05 | $2,949,567.00 | $2,492,455.00 |
| Rank 2of 2 | 6501-26-001 Callout Traffic Control | PECOS | 2026-07-15 | $1,191,520.00 | $1,187,750.00 |
| Rank 2of 5 | FY26 Brenham AO TY B Gr 5 - 07 | WASHINGTON | 2026-07-15 | $118,100.00 | $115,500.00 |
| Low bidof 2 | Cameron County Expressway Sweeping | CAMERON | 2026-07-10 | $469,494.00 | $469,494.00 |
| Low bidof 3 | EAO Storm Sewer & Culvert Cleaning | EL PASO | 2026-07-09 | $478,000.00 | $478,000.00 |
| Rank 2of 3 | AUS_CoPflPKWY(HSIP23) | TRAVIS | 2026-07-02 | $724,563.14 | $685,485.00 |
| Rank 2of 3 | Districtwide Concrete Repair FY 26 | TRAVIS | 2026-07-02 | $1,187,680.00 | $756,200.00 |
| Rank 3of 10 | Bridge Repair and Maintenance | HARRIS | 2026-07-02 | $1,091,070.00 | $898,477.00 |
| Rank 4of 6 | Tree & Stump Removal/Trimming (W) FY '27 | UPSHUR | 2026-07-02 | $997,155.40 | $763,249.15 |
| Rank 5of 6 | US 84 Safety Lighting | SCURRY | 2026-07-01 | $996,820.00 | $814,950.00 |
| Rank 6of 7 | Concrete Pavement Repair McLennan DW | HILL | 2026-07-01 | $1,948,502.00 | $1,432,275.00 |
| Rank 2of 2 | FY26 Sweeping & Debris Removal N Tarrant | TARRANT | 2026-07-01 | $2,325,904.80 | $1,498,682.88 |
| Rank 3of 11 | BPM - FY 2027 | MCLENNAN | 2026-07-01 | $1,084,000.00 | $922,471.00 |
| Rank 3of 3 | RCLHPP (HCDD1) FM 2220 | HIDALGO | 2026-06-25 | $308,460.80 | $220,216.00 |
| Rank 3of 3 | Flex Base-North FY 26 | TOM GREEN | 2026-06-18 | $101,066.00 | $83,550.00 |
| Rank 3of 3 | FY26 District Flowable Fill - 06 | BRAZOS | 2026-06-11 | $181,743.75 | $150,000.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.