Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
629 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 7of 8 | NAAO - FY 26 Small Sign Upgrades | TRAVIS | 2026-06-03 | $289,407.00 | $209,560.00 |
| Rank 11of 11 | SFT | IH 14 | Jasper Dr | Rosewood Dr | BELL | 2026-06-03 | $4,313,616.92 | $2,981,025.83 |
| Rank 4of 7 | AUS_CoAHARRISBRANCHPKY(HSIP23) | TRAVIS | 2026-06-03 | $497,834.99 | $405,662.40 |
| Rank 4of 7 | Freddy Gonzalez Dr & Closner Blvd Inters | HIDALGO | 2026-06-03 | $591,189.39 | $493,025.00 |
| Rank 5of 6 | FY26 GR-Districtwide Wildflower Seeding | TRAVIS | 2026-06-03 | $484,750.00 | $425,750.00 |
| Rank 2of 2 | Sweeping and Debris 01 0626 | NAVARRO | 2026-06-03 | $1,098,203.50 | $1,093,690.14 |
| Rank 5of 7 | Dee Gabriel Collins at Cottonmouth Sch | TRAVIS | 2026-06-02 | $489,923.00 | $388,598.00 |
| Rank 8of 8 | RM 620 - Colorado River (BMIP24) | TRAVIS | 2026-06-02 | $4,439,428.50 | $3,335,184.39 |
| Rank 4of 7 | SH 360 NBFR: At AVE J | TARRANT | 2026-06-02 | $1,485,932.90 | $1,177,759.00 |
| Rank 3of 3 | Cement Material Only | ARCHER | 2026-05-27 | $483,531.00 | $421,600.00 |
| Rank 4of 4 | FY 27 Rock/RipRap | JEFFERSON | 2026-05-26 | $345,101.50 | $287,250.00 |
| Rank 3of 4 | FY 27 OAO Rock/RipRap | ORANGE | 2026-05-26 | $250,741.00 | $211,750.00 |
| Rank 3of 4 | FY 27 LAO Rock/RipRap | LIBERTY | 2026-05-26 | $163,036.50 | $145,000.00 |
| Low bidof 2 | Hydraulic Cement Concrete - Districtwide | BELL | 2026-05-19 | $393,172.60 | $393,172.60 |
| Rank 3of 5 | FY25 Large Sign Maintenance | TRAVIS | 2026-05-13 | $383,564.00 | $338,450.00 |
| Rank 6of 7 | FM2320 Drainage Improvement | KENT | 2026-05-13 | $993,516.30 | $572,628.00 |
| Rank 3of 4 | CTTS Small Signs Set 5 FY 25 | TRAVIS | 2026-05-13 | $569,114.00 | $439,780.98 |
| Rank 4of 5 | VARIOUS LOCATIONS TRAVIS COUNTY | TRAVIS | 2025-08-08 | $953,432.00 | $581,040.00 |
| Rank 2of 4 | FY 25 High Volume Sweeping | JEFFERSON | 2025-08-08 | $1,227,472.96 | $1,224,806.74 |
| Rank 11of 12 | DW Bridge Concrete Repair 2508 | DE WITT | 2025-08-08 | $369,930.00 | $223,847.00 |
| Rank 2of 3 | FY 26 AMA District Traction Control | GRAY | 2025-08-08 | $1,162,393.00 | $1,132,168.64 |
| Rank 2of 5 | 6485-25-001 Aggregate | MIDLAND | 2025-07-08 | $47,250.00 | $41,795.25 |
| Rank 3of 5 | 6486-17-001 Aggregate | ECTOR | 2025-07-08 | $28,700.00 | $21,645.00 |
| Rank 3of 5 | 6486-18-001 Aggregate | PECOS | 2025-07-08 | $32,500.00 | $23,966.50 |
| Rank 3of 4 | Sweeping and Debris Removal 07 0725 | COLLIN | 2025-07-02 | $1,344,302.50 | $1,040,055.52 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.