Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
280 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 5of 7 | PR 22 Nueces Cathodic Protection BMIP | NUECES | 2025-07-02 | $2,500,272.00 | $1,759,250.97 |
| Rank 6of 8 | CR 258/SIGN CR 341 at Draw | COOKE | 2025-07-01 | $3,146,673.00 | $2,437,820.96 |
| Rank 9of 9 | US 90 (@ HILLEBRANDT BAYOU)BRIDGE REHAB | JEFFERSON | 2025-07-01 | $10,241,906.25 | $5,167,739.54 |
| Rank 3of 6 | US 67 From US 67 SB at Wheatland Road | DALLAS | 2025-07-01 | $5,948,520.05 | $4,922,876.30 |
| Rank 8of 11 | FY 26 BPM | JASPER | 2025-07-01 | $983,274.00 | $594,805.82 |
| Rank 6of 6 | 0907-00-232 Clean and Seal Bridge Joints | TOM GREEN | 2025-06-05 | $396,295.00 | $274,353.00 |
| Rank 9of 9 | VA Location - Bridge Repair | HARRIS | 2025-06-05 | $3,094,090.00 | $1,851,563.00 |
| Rank 3of 8 | BPM FY 2026 | POTTER | 2025-06-05 | $1,187,016.33 | $1,052,829.50 |
| Rank 10of 12 | Clean and Seal Joints Denton FY 25 | DENTON | 2025-06-05 | $1,398,740.00 | $887,943.00 |
| Rank 4of 5 | US 90 PECOS RIVER BRIDGE | VAL VERDE | 2025-06-05 | $232,400.00 | $108,050.00 |
| Rank 6of 6 | FY 25 - DW Bridge Repair | BRAZOS | 2025-05-02 | $1,139,170.00 | $590,567.00 |
| Low bidof 5 | FY 27 RR Bridges @ Various Locations | SMITH | 2025-05-02 | $2,796,332.40 | $2,796,332.40 |
| Rank 6of 6 | FY 2025 BTAO BR FUA Repairs | TRAVIS | 2025-05-02 | $1,864,550.00 | $865,709.00 |
| Rank 5of 9 | BMIP SL 322 NB AT UPRR TAYLOR CO | TAYLOR | 2025-05-01 | $1,589,670.00 | $1,338,126.80 |
| Rank 9of 9 | FY 25 - AUS BR Maint | TRAVIS | 2025-05-01 | $1,495,350.00 | $659,811.50 |
| Low bidof 4 | FY 25 Bridges @ Various Locations | SMITH | 2025-05-01 | $7,333,627.70 | $7,333,627.70 |
| Rank 7of 8 | BAAO/STAO - BR FUA Repairs (FY25) | TRAVIS | 2025-05-01 | $3,579,680.00 | $2,334,542.00 |
| Rank 3of 5 | SH 288 Bridge Deck Repair | BRAZORIA | 2025-04-15 | $482,290.00 | $307,652.00 |
| Rank 5of 7 | FY 25 BPM Burnet | BURNET | 2025-04-09 | $476,505.00 | $347,061.00 |
| Rank 2of 6 | Steel Bridge Repair | DALLAS | 2025-04-09 | $392,686.75 | $337,964.60 |
| Rank 3of 6 | US 83 - 1 - 1/1 | TAYLOR | 2025-04-04 | $850,483.00 | $493,190.20 |
| Rank 2of 5 | US 287 NB/FM 281 & RR BRG FY 25 BMIP | MOORE | 2025-04-04 | $3,648,092.40 | $3,547,551.90 |
| Rank 10of 12 | BMN | Bridge Joint Repair - Districwide | MCLENNAN | 2025-04-04 | $4,171,045.00 | $3,067,458.00 |
| Rank 3of 4 | VA: 0915-00-276: BRG Repair District | BEXAR | 2025-04-03 | $9,148,925.50 | $7,263,765.26 |
| Rank 2of 7 | 2025 BRIDGE PREVENTATIVE MAINTENANCE | SMITH | 2025-04-03 | $3,925,830.00 | $3,583,067.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.