Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
280 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 2of 3 | US 70 Bridge Repair | WILBARGER | 2025-03-13 | $132,650.00 | $112,028.00 |
| Rank 12of 14 | FY2025_VA_Bridge Maint - BMN | ANGELINA | 2025-03-05 | $1,253,255.00 | $821,221.00 |
| Rank 4of 10 | SH 16 - AT Oatman Crk - 25BMIP | LLANO | 2025-03-05 | $2,421,432.00 | $2,089,129.10 |
| Rank 7of 7 | FY 2025 BRIDGE MAINT (ELP COUNTYWIDE) | EL PASO | 2025-03-05 | $3,468,010.00 | $2,373,713.00 |
| Rank 6of 6 | 0922-00, Districtwide Upgrade Rail | WEBB | 2025-03-04 | $5,423,560.00 | $3,111,940.00 |
| Rank 18of 19 | FM 2571 - AT Gazley Crk - 25 BMIP | BASTROP | 2025-03-04 | $341,180.00 | $180,204.00 |
| Rank 4of 8 | FY 25 District wide Bridge PM | WICHITA | 2025-02-07 | $4,402,792.50 | $3,651,021.44 |
| Rank 8of 9 | 0141-18-008 Bridge Rehab | KIMBLE | 2025-02-07 | $2,888,061.00 | $1,716,913.57 |
| Rank 13of 13 | US 290 - At Cottonwd & B Dry Ck, 25BMIP | TRAVIS | 2025-02-06 | $511,470.00 | $304,980.00 |
| Rank 9of 10 | SH 29 - AT San Gabriel Rv, 25BMIP | WILLIAMSON | 2025-02-06 | $596,989.00 | $279,317.00 |
| Low bidof 7 | BPM FY 2025 | POTTER | 2025-02-06 | $1,595,496.40 | $1,595,496.40 |
| Rank 6of 6 | Avery NETT SUP | RED RIVER | 2025-01-08 | $4,093,862.00 | $2,074,733.10 |
| Rank 4of 4 | US 59 from S of FM 2148 to Sulphur River | BOWIE | 2025-01-08 | $3,965,764.00 | $2,402,680.34 |
| Rank 4of 6 | FY 2025 Concrete Pavement US 75 | GRAYSON | 2025-01-07 | $1,937,530.00 | $1,472,289.00 |
| Rank 3of 3 | FY 2025 BRIDGE MAINTENANCE | POTTER | 2025-01-07 | $1,644,985.00 | $1,182,257.12 |
| Rank 10of 12 | IH 30 WB Bill Bradford Bridge Repair | HOPKINS | 2025-01-07 | $1,068,900.00 | $339,000.00 |
| Rank 9of 12 | HAZARD ELIMINATION & SAFETY | KAUFMAN | 2024-12-04 | $4,732,152.50 | $3,495,000.00 |
| Rank 10of 11 | BRIDGE MAINTENANCE | TARRANT | 2024-12-04 | $1,636,412.50 | $896,115.50 |
| Rank 7of 8 | BICYCLE AND PEDESTRIAN IMPROVEMENTS | BOWIE | 2024-12-03 | $2,375,962.00 | $1,943,602.00 |
| Low bidof 5 | REHABILITATE BRIDGE | TARRANT | 2024-12-03 | $2,584,707.50 | $2,584,707.50 |
| Rank 4of 5 | REHABILITATE BRIDGE | TARRANT | 2024-11-07 | $6,291,258.00 | $5,157,489.52 |
| Rank 5of 5 | HAZARD ELIMINATION & SAFETY | MITCHELL | 2024-11-07 | $1,485,856.00 | $1,243,855.77 |
| Rank 6of 7 | BRIDGE MAINTENANCE | JOHNSON | 2024-11-06 | $3,363,323.00 | $2,082,914.00 |
| Rank 7of 11 | INSTALL/UPGRADE DRAINAGE STRUCTURE(S) | STEPHENS | 2024-11-06 | $660,777.00 | $501,898.98 |
| Rank 6of 7 | REHABILITATE EXISTING ROADWAY | DALLAS | 2024-10-02 | $8,897,473.61 | $7,572,475.59 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.