Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
167 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 9of 17 | BRIDGE IDENTIFICATION NUMBERS | CONCHO | 2020-06-30 | $128,664.00 | $88,628.00 |
| Rank 3of 5 | REPLACE BRIDGE AND APPROACHES | EASTLAND | 2020-06-04 | $932,535.96 | $858,822.80 |
| Rank 4of 5 | REPLACE BRIDGE AND APPROACHES | MONTAGUE | 2020-06-04 | $539,686.04 | $443,571.00 |
| Low bidof 5 | BRIDGE REPAIR | REEVES | 2020-06-04 | $831,572.20 | $831,572.20 |
| Rank 8of 10 | REPLACE BRIDGE AND APPROACHES | COMANCHE | 2020-05-07 | $766,113.40 | $591,668.00 |
| Rank 6of 9 | BRIDGE PREVENTIVE MAINTENANCE | GARZA | 2020-05-07 | $844,648.90 | $517,184.80 |
| Rank 3of 4 | REPLACEMENT OF SIGNS | IRION | 2020-04-14 | $294,019.96 | $210,113.00 |
| Rank 6of 6 | BPM - BRIDGE REPAIR | NAVARRO | 2020-04-14 | $216,494.00 | $159,600.00 |
| Low bidof 8 | BRIDGE PREVENTATIVE MAINTENANCE | WHEELER | 2020-02-07 | $697,998.00 | $697,998.00 |
| Rank 2of 11 | MISCELLANEOUS BRIDGE REPAIR | TAYLOR | 2020-02-06 | $898,477.00 | $798,993.99 |
| Rank 3of 6 | BRIDGE BEAM REPAIRS | TOM GREEN | 2020-01-23 | $116,279.00 | $72,200.00 |
| Rank 2of 3 | CONCRETE STRUCTURE REPAIR | JIM WELLS | 2020-01-14 | $257,400.00 | $227,460.00 |
| Rank 6of 8 | FY 2020 BPM PROJECT | POTTER | 2020-01-10 | $929,930.70 | $660,194.32 |
| Rank 3of 15 | BRIDGE REPAIRS | CROCKETT | 2019-11-15 | $216,804.00 | $141,454.89 |
| Rank 3of 13 | BRIDGE REPAIRS | RUNNELS | 2019-11-15 | $146,744.00 | $95,000.00 |
| Rank 3of 12 | BRIDGE REPAIRS | IRION | 2019-11-15 | $144,767.00 | $99,000.00 |
| Low bidof 12 | BRIDGE REPAIRS | CONCHO | 2019-11-15 | $157,962.00 | $157,962.00 |
| Rank 6of 6 | STONE RIP RAP AND SCOUR COUNTERMEASURES | BRAZOS | 2019-10-08 | $195,845.00 | $125,777.00 |
| Rank 2of 4 | SCOUR PROTECTION, PAINTING, RIP RAP | FREESTONE | 2019-10-08 | $332,900.00 | $229,055.00 |
| Rank 3of 8 | REPAIRING BRIDGE JOINTS AND STRIPING | ECTOR | 2019-10-03 | $1,055,459.00 | $951,628.00 |
| Low bidof 6 | BRIDGE PREVENTATIVE MAINTENANCE | SAN AUGUSTINE | 2019-09-06 | $718,542.00 | $718,542.00 |
| Low bidof 3 | BPM | TARRANT | 2019-09-04 | $257,667.00 | $257,667.00 |
| Rank 2of 5 | BRIDGE PREVENTATIVE MAINTENANCE | BAYLOR | 2019-08-07 | $1,089,001.00 | $833,012.50 |
| Rank 3of 6 | CONCRETE STRUCTURE REPAIR AND JOINT CLEANING | HARRISON | 2019-08-06 | $456,212.00 | $329,387.00 |
| Low bidof 4 | HAZARD ELIMINATION & SAFETY | WISE | 2019-08-06 | $80,011.00 | $80,011.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.