Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
162 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 5of 6 | FY27_DistrictwideLargeSign | ECTOR | 2026-10-07 | $1,410,982.95 | $899,871.00 |
| Rank 4of 11 | 6507-26-001 Brush Removal | MIDLAND | 2026-10-07 | $1,135,710.20 | $746,150.00 |
| Rank 2of 3 | On Call Traffic Control-Grayson FY27 | GRAYSON | 2026-09-17 | $970,504.10 | $920,000.00 |
| Rank 7of 7 | INSTALL & REMOVE LARGE ROADSIDE SIGN AS | EASTLAND | 2026-09-15 | $219,382.04 | $172,198.00 |
| Rank 6of 8 | FY 2027:Non-site Specific Traf Signals | DALLAS | 2026-09-03 | $4,452,316.26 | $4,190,000.00 |
| Rank 3of 5 | No Trucks Left Lane IH 35E Ellis County | ELLIS | 2026-09-03 | $1,973,446.10 | $1,799,754.61 |
| Rank 2of 2 | Traffic Data Site Repair and Install | TRAVIS | 2026-09-03 | $1,707,474.15 | $1,551,126.00 |
| Rank 5of 8 | Lrg Guide Sign US75 07/26 | DALLAS | 2026-08-12 | $1,063,992.18 | $732,848.24 |
| Rank 9of 9 | Traffic TCD 2026 | TARRANT | 2026-08-06 | $1,504,142.01 | $1,054,946.50 |
| Rank 10of 14 | FM 3005: Kiva Rd to S of 89th St | GALVESTON | 2026-08-06 | $3,234,286.27 | $2,099,052.03 |
| Rank 7of 10 | SL 12 from US 175 to Pemberton Hill | DALLAS | 2026-08-06 | $2,861,321.81 | $2,138,842.27 |
| Rank 5of 7 | SH 11 HSIP | HOPKINS | 2026-08-06 | $79,088.84 | $48,148.00 |
| Rank 13of 13 | SH 6 - Memorial Dr to Westpark Dr | HARRIS | 2026-08-05 | $2,903,264.82 | $1,834,898.09 |
| Rank 4of 4 | SFT | Bosque Blvd @ N 34th St | MCLENNAN | 2026-08-05 | $2,308,120.80 | $1,517,538.15 |
| Rank 9of 10 | US 281: from FM 3027 to FM 3027 | PALO PINTO | 2026-08-05 | $258,914.34 | $180,929.60 |
| Rank 6of 7 | IOI | @FM 438/Young Ave | BELL | 2026-08-05 | $677,871.93 | $523,303.30 |
| Rank 12of 12 | VA; 0915-12-820; Illumination | BEXAR | 2026-08-05 | $1,250,352.27 | $757,888.00 |
| Rank 15of 15 | SFT | FM 218 | @ FM 1702 | HAMILTON | 2025-03-04 | $271,043.00 | $133,517.11 |
| Rank 4of 6 | Anderson Tree Removal - FY25 | ANDERSON | 2025-01-21 | $713,060.00 | $436,408.00 |
| Rank 3of 3 | Installation of Traffic Signal | COLORADO | 2025-01-17 | $325,229.91 | $146,024.63 |
| Rank 9of 9 | IH 610, From Evergreen To Fournace Place | HARRIS | 2025-01-07 | $394,458.85 | $152,861.16 |
| Rank 3of 4 | SMALL SIGN REPLACEMENT | COLLIN | 2024-10-31 | $157,015.00 | $102,300.00 |
| Rank 3of 4 | SMALL SIGN REPLACEMENT | DENTON | 2024-10-31 | $201,815.00 | $139,435.00 |
| Rank 5of 11 | TREE TRIMMING AND BRUSH REMOVAL | COOKE | 2024-08-13 | $57,565.00 | $46,041.80 |
| Rank 4of 6 | TREE TRIMMING AND BRUSH REMOVAL | MCCULLOCH | 2024-07-09 | $645,393.50 | $593,412.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.