Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
207 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Low bidof 7 | FY2026 - BPM Jack & Wise Counties | WISE | 2026-10-07 | $1,040,614.79 | $1,040,614.79 |
| Rank 6of 8 | BAAO FY26 GR- SL109; SH21; US290; FM1704 | BASTROP | 2026-08-06 | $608,789.50 | $224,026.70 |
| Low bidof 10 | US 80 at Big Brushy Creek | KAUFMAN | 2026-08-05 | $799,617.05 | $799,617.05 |
| Rank 3of 5 | 2026-07 North BPM | SABINE | 2026-07-23 | $972,418.00 | $807,680.00 |
| Rank 3of 3 | FY 27 BPM - Site Specific - East | GREGG | 2026-07-21 | $799,491.00 | $473,835.00 |
| Rank 4of 4 | FY27 BPM - Site Specific - West | ANDERSON | 2026-07-21 | $548,827.00 | $411,596.60 |
| Rank 3of 5 | FY 27 BPM Site Specific Central | SMITH | 2026-07-21 | $724,299.40 | $553,299.00 |
| Low bidof 9 | BPM Debris Removal FY 26 | WHARTON | 2026-07-08 | $152,900.00 | $152,900.00 |
| Rank 2of 6 | FY27 - Washington Co BPM -06 | WASHINGTON | 2026-06-11 | $574,809.00 | $546,000.00 |
| Rank 3of 7 | BPM Concrete Repairs FY 26 #2 | VICTORIA | 2026-06-10 | $193,942.00 | $182,850.00 |
| Low bidof 5 | Culvert Replacement 07 06.26 | COLLIN | 2026-06-10 | $109,861.00 | $109,861.00 |
| Low bidof 7 | 2026-06 Polk (South) BPM | POLK | 2026-06-10 | $464,739.85 | $464,739.85 |
| Rank 3of 7 | FY27 - US79 Prep ROW -06 | ROBERTSON | 2026-06-10 | $791,737.50 | $698,834.00 |
| Rank 3of 11 | BPM FY2027 Atlanta District | BOWIE | 2026-06-03 | $1,248,898.00 | $904,025.08 |
| Rank 2of 7 | FM2320 Drainage Improvement | KENT | 2026-05-13 | $611,851.00 | $572,628.00 |
| Rank 5of 5 | FY 26 Guardrail | BASTROP | 2026-05-13 | $1,335,956.00 | $757,352.00 |
| Low bidof 6 | Tree Trimming Hill FY26 | HILL | 2026-04-29 | $486,600.00 | $486,600.00 |
| Rank 6of 8 | Culvert Repair Franklin Co. | FRANKLIN | 2026-04-16 | $182,500.00 | $121,450.00 |
| Rank 10of 12 | FUA erosion Repair 26 | LAMAR | 2026-04-08 | $1,198,550.00 | $734,734.00 |
| Low bidof 8 | Misc Concrete Repair DW | MCLENNAN | 2026-04-08 | $755,540.00 | $755,540.00 |
| Rank 7of 7 | FY2026 FM 3175 AT W PRONG ATASCOSA RIVER | ATASCOSA | 2026-03-18 | $337,055.20 | $72,204.00 |
| Rank 7of 7 | FM 2438 AT MILL CREEK FY2026 | GUADALUPE | 2026-03-18 | $155,957.00 | $48,346.00 |
| Rank 4of 12 | Bridge Preventative Maintenance 09 0326 | ELLIS | 2026-03-11 | $399,380.00 | $369,500.00 |
| Low bidof 3 | CR 252 REMOVE BRIDGE 2610 | VICTORIA | 2026-02-05 | $497,178.00 | $497,178.00 |
| Rank 2of 7 | BPM Concrete Repairs FY 26 #1 | FAYETTE | 2026-01-12 | $170,316.00 | $164,770.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.