Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
216 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 5of 5 | BRIDGE REPLACEMENT | HARRIS | 2024-06-05 | $11,065,158.35 | $6,980,350.30 |
| Rank 2of 2 | ASPHALT PAVEMENT REPAIR | FORT BEND | 2024-05-02 | $562,600.00 | $538,200.00 |
| Rank 4of 5 | ASPHALT PAVEMENT REPAIR | COLORADO | 2024-05-02 | $598,800.80 | $468,903.40 |
| Rank 6of 11 | INSTALL/UPGRADE DRAINAGE STRUCTURE(S) | MONTGOMERY | 2024-04-05 | $10,688,090.37 | $8,197,532.35 |
| Rank 5of 8 | DRAINAGE IMPROVEMENT AND/OR REPAIRS | HARRIS | 2024-04-04 | $818,809.00 | $596,282.00 |
| Rank 7of 8 | REHABILITATE BRIDGE | HARRIS | 2024-03-06 | $1,196,255.00 | $670,070.00 |
| Rank 2of 3 | ASPHALT PAVEMENT REPAIR | GALVESTON | 2024-03-06 | $1,856,400.00 | $1,490,630.00 |
| Rank 7of 8 | INTERSECTION IMPROVEMENTS WITH LEFT TURN LANE | WALKER | 2024-02-02 | $1,688,255.99 | $1,036,981.25 |
| Rank 5of 5 | BASE REPAIR, 1.5" PLANING, 1.5" ACP OVERLAY | WALLER | 2024-01-05 | $4,983,973.59 | $4,087,471.73 |
| Rank 5of 6 | BRIDGE MAINTENANCE | COLORADO | 2024-01-04 | $11,437,146.55 | $8,899,649.39 |
| Rank 5of 6 | REHABILITATE BRIDGE | HARRIS | 2023-12-05 | $8,827,958.40 | $4,990,800.71 |
| Low bidof 2 | ASPHALT PAVEMENT REPAIR | MONTGOMERY | 2023-11-01 | $1,525,300.00 | $1,525,300.00 |
| Rank 3of 5 | HIKE AND/OR BIKE | MONTGOMERY | 2023-10-06 | $5,454,220.93 | $4,077,635.10 |
| Low bidof 3 | SURFACING/ROADWAY RESTORATION | FORT BEND | 2023-09-07 | $1,866,653.18 | $1,866,653.18 |
| Rank 5of 7 | SURFACING/ROADWAY RESTORATION | MONTGOMERY | 2023-08-03 | $2,305,355.15 | $2,012,093.41 |
| Low bidof 6 | BRIDGE REPLACEMENT | GRIMES | 2023-08-02 | $2,278,373.18 | $2,278,373.18 |
| Rank 6of 8 | SURFACING/ROADWAY RESTORATION | MONTGOMERY | 2023-08-02 | $1,266,391.11 | $1,006,888.63 |
| Rank 4of 4 | INSTALL RAISED MEDIAN | WASHINGTON | 2023-06-28 | $7,772,126.62 | $6,554,342.36 |
| Rank 2of 4 | MILL AND INLAY | LIBERTY | 2023-06-28 | $3,683,191.79 | $3,176,353.60 |
| Rank 3of 4 | ASPHALT PAVEMENT WIDENING | CHAMBERS | 2023-06-28 | $1,487,066.95 | $1,219,731.95 |
| Rank 6of 8 | BRIDGE SCOUR REPAIR | BRAZOS | 2023-06-14 | $260,858.00 | $161,072.00 |
| Rank 5of 6 | BRIDGE SCOUR REPAIR | WALKER | 2023-06-13 | $355,857.00 | $234,272.00 |
| Low bidof 2 | ASPHALT PAVEMENT REPAIR | FORT BEND | 2023-05-04 | $379,200.00 | $379,200.00 |
| Rank 5of 5 | BRIDGE REPAIR | HARRIS | 2023-04-11 | $527,295.00 | $205,065.00 |
| Rank 4of 5 | CONCRETE STRUCTURE REPAIR | HARRIS | 2023-03-09 | $218,971.00 | $87,820.20 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.