Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
216 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 7of 9 | Pool Hill Rd at Brookshire Creek | FORT BEND | 2026-10-06 | $2,548,134.90 | $1,963,405.10 |
| Rank 6of 6 | 2027 Seal Coat-US 9O WB(W/FM 1009-EAST) | LIBERTY | 2026-09-03 | $14,420,665.35 | $11,067,539.02 |
| Rank 4of 5 | SH 36 Seal Coat: SS 10 to W of UA 90 | FORT BEND | 2026-09-03 | $3,327,568.65 | $2,934,889.29 |
| Rank 8of 11 | FM 2004 at Highland Bayou | GALVESTON | 2026-09-02 | $3,853,055.29 | $3,199,825.40 |
| Rank 10of 12 | CR 125 Bridge Replacement 2711 | WHARTON | 2026-09-02 | $3,484,017.41 | $2,677,071.10 |
| Rank 3of 5 | IH 45 FR OL: N of BNSF RR to Canino | HARRIS | 2026-08-06 | $5,800,224.52 | $5,092,365.20 |
| Rank 6of 7 | US 290 at Cypress Creek | HARRIS | 2026-08-05 | $2,512,946.50 | $1,422,408.75 |
| Rank 7of 8 | IH 10 at Wayside Dr and McCarty St | HARRIS | 2026-07-14 | $750,713.00 | $488,125.00 |
| Low bidof 4 | SH 36: At Moore Bar Rd | FORT BEND | 2026-07-01 | $637,103.65 | $637,103.65 |
| Rank 2of 3 | FM 2090 Base Repair and Overlay | LIBERTY | 2026-06-10 | $871,801.50 | $726,406.30 |
| Rank 5of 7 | SH 90 at FM 244 - Turn Lane FY 26 | GRIMES | 2026-06-02 | $1,396,389.60 | $1,241,182.50 |
| Rank 4of 4 | FY26 Brazoria Flexpave/Asphalt Repair | BRAZORIA | 2026-06-02 | $1,870,672.00 | $1,369,590.00 |
| Rank 3of 3 | RMC 6495-46-001 | WALLER | 2026-04-14 | $620,000.00 | $481,400.00 |
| Rank 5of 5 | 2025 DRAINAGE REPAIR | HARRIS | 2026-04-14 | $265,573.84 | $177,984.05 |
| Rank 6of 6 | FM 359: At Jones Creek- Retaining Wall | FORT BEND | 2026-04-08 | $1,563,116.50 | $563,744.50 |
| Rank 4of 6 | FM 529: At Horsepen Creek | HARRIS | 2026-04-07 | $615,029.00 | $383,467.00 |
| Low bidof 4 | FM 2100: San Jacinto Canal to BU 90U | HARRIS | 2026-04-07 | $1,798,696.38 | $1,798,696.38 |
| Rank 2of 3 | 2026 ASPHALT PAVEMENT REPAIR | GALVESTON | 2026-03-10 | $1,147,680.00 | $915,900.00 |
| Low bidof 9 | SL 8, Briar Forest to Briar Hill | HARRIS | 2026-03-04 | $2,049,391.00 | $2,049,391.00 |
| Rank 14of 14 | US 90 BRIDGE REPLACEMENT 2304-1 | COLORADO | 2026-02-05 | $5,410,539.79 | $3,715,521.15 |
| Rank 3of 12 | FM 1093 BRIDGE REPLACEMENT 2610 | AUSTIN | 2026-02-05 | $5,584,884.42 | $4,981,961.80 |
| Rank 7of 10 | BPM | MONTGOMERY | 2026-02-04 | $1,633,835.00 | $1,198,560.00 |
| Rank 5of 11 | FM 1458 BRIDGE REPLACEMENT 2110 | AUSTIN | 2026-01-07 | $966,028.37 | $936,878.37 |
| Rank 7of 10 | FM 1160 BRIDGE REPLACEMENT 2305 | WHARTON | 2026-01-07 | $3,256,767.50 | $2,791,031.37 |
| Rank 2of 12 | FM 1314: N of SH 242 | MONTGOMERY | 2026-01-07 | $2,278,862.66 | $2,219,724.30 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.