Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
198 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 3of 5 | PAVEMENT MARKINGS | TOM GREEN | 2019-01-09 | $1,665,357.15 | $1,514,294.85 |
| Rank 2of 6 | MILLED CENTERLINE RUMBLE STRIPS | COLLINGSWORTH | 2018-12-05 | $84,213.40 | $72,769.78 |
| Rank 3of 7 | RETRACE PAVEMENT MARKINGS AND MARKERS | RUNNELS | 2018-11-07 | $857,933.92 | $762,761.14 |
| Rank 6of 9 | MILLED EDGELINE & MILLED CENTERLINE RUMBLE STRIPS | GRAY | 2018-11-06 | $1,852,377.30 | $1,357,600.03 |
| Rank 3of 6 | THERMOPLASTIC RE-STRIPING | WEBB | 2018-11-06 | $689,487.05 | $638,114.32 |
| Low bidof 6 | THERMOPLASTIC RE-STRIPING | WEBB | 2018-10-03 | $630,091.27 | $630,091.27 |
| Rank 2of 3 | CLEANING AND SEALING CRACKS | PECOS | 2018-09-11 | $215,707.00 | $206,600.00 |
| Rank 3of 3 | CLEANING AND SEALING JOINTS AND CRACKS | MIDLAND | 2018-08-14 | $385,104.00 | $116,235.00 |
| Rank 4of 4 | ROADSIDE MOWING | CRANE | 2018-08-14 | $302,760.00 | $154,744.00 |
| Rank 3of 3 | CLEANING AND SEALING CRACKS | ECTOR | 2018-08-14 | $341,182.00 | $92,955.35 |
| Low bidof 6 | MILLED EDGELINE/CENTERLINE RUMBLE | COLEMAN | 2018-05-02 | $1,682,223.98 | $1,682,223.98 |
| Rank 2of 9 | NON-IH PAVEMENT MARKINGS | ECTOR | 2018-03-07 | $1,119,423.98 | $1,063,374.41 |
| Low bidof 1 | MOWING HIGHWAY RIGHT OF WAY | CULBERSON | 2018-02-22 | $301,201.00 | $301,201.00 |
| Low bidof 7 | THERMOPLASTIC STRIPING | POTTER | 2018-02-02 | $482,197.48 | $482,197.48 |
| Rank 2of 6 | INSTALL PAVEMENT MARKINGS | HOWARD | 2018-02-02 | $1,722,896.58 | $1,637,144.66 |
| Rank 2of 8 | TEXTURIZE SHOULDERS, CENTERLINE TEXTURING | GOLIAD | 2018-02-01 | $876,141.29 | $858,712.66 |
| Low bidof 5 | PAVEMENT MARKERS | LUBBOCK | 2018-02-01 | $2,938,105.40 | $2,938,105.40 |
| Rank 2of 5 | FY 2018 STRIPING PROJECT | EL PASO | 2018-02-01 | $919,512.62 | $783,671.49 |
| Rank 2of 2 | ROADSIDE MOWING | REEVES | 2018-01-09 | $321,024.00 | $220,688.00 |
| Rank 2of 2 | ROADSIDE MOWING | PECOS | 2018-01-09 | $511,404.00 | $297,328.00 |
| Rank 2of 2 | ROADSIDE MOWING | MARTIN | 2018-01-09 | $248,160.00 | $198,528.00 |
| Rank 2of 2 | ROADSIDE MOWING | WARD | 2018-01-09 | $338,960.00 | $258,680.00 |
| Rank 2of 2 | ROADSIDE MOWING | REEVES | 2018-01-09 | $337,480.00 | $286,858.00 |
| Rank 3of 3 | ROADSIDE MOWING | TERRELL | 2018-01-09 | $223,776.00 | $183,549.60 |
| Low bidof 1 | ROADSIDE MOWING | ECTOR | 2018-01-04 | $398,580.00 | $398,580.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.