Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
427 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 2of 4 | ROADWAY WIDENING | WOOD | 2017-04-04 | $1,298,128.33 | $1,287,284.82 |
| Rank 4of 5 | GR,SGNL,ACP BS&SURF,C&G,STM SWR,PED RMP,PV MK | SMITH | 2017-03-08 | $2,791,959.65 | $2,355,455.50 |
| Rank 4of 4 | PLANE ACP, ACP SURF, & PAV MARK | HARRISON | 2017-03-08 | $1,690,509.85 | $1,295,848.08 |
| Rank 6of 6 | PLANING, BS RPR, OCST, PFC SURF, PV MK | SMITH | 2017-03-08 | $2,350,791.90 | $1,789,204.91 |
| Rank 5of 6 | RECONSTRUCT EXISTING PAVEMENT, ETC. | TRINITY | 2017-03-07 | $2,851,992.85 | $1,947,390.02 |
| Rank 4of 5 | PLANE ACP, ACP SURF, & PAV MARK | PANOLA | 2017-03-07 | $1,027,226.56 | $876,859.30 |
| Low bidof 9 | RPLC BRG & APPR, GR, ACP BS & SURF, MBGF | ANDERSON | 2017-03-07 | $753,675.60 | $753,675.60 |
| Low bidof 7 | REPLACE BRIDGE AND APPROACHES | SAN AUGUSTINE | 2017-03-07 | $2,474,844.69 | $2,474,844.69 |
| Rank 2of 5 | BASE REPAIR, CRAC SEAL, HMAC OVERLAY | SMITH | 2017-03-07 | $1,382,738.10 | $1,269,696.00 |
| Rank 6of 6 | SURF TRT, ACP SURF, MBGF, PVMT MRKG | RUSK | 2017-03-07 | $6,008,011.58 | $4,670,549.69 |
| Rank 5of 8 | BRIDGE REPLACEMENT | NACOGDOCHES | 2017-03-07 | $1,984,891.95 | $1,774,829.45 |
| Rank 3of 4 | REHABILITATE EXISTING ROADWAY | JASPER | 2017-03-07 | $974,346.50 | $538,722.70 |
| Rank 8of 9 | SAFETY TREAT FIXED OBJECTS | JASPER | 2017-02-03 | $659,382.00 | $368,813.00 |
| Rank 5of 7 | BASE, SURFACING & PAVEMENT MARKINGS | BOWIE | 2017-02-03 | $1,197,321.15 | $897,910.60 |
| Rank 7of 10 | SAFETY TREAT FIXED OBJECTS | NACOGDOCHES | 2017-02-02 | $1,024,142.70 | $775,621.06 |
| Rank 5of 5 | RECONSTRUCT AND WIDEN PAVEMENT | HOUSTON | 2017-02-02 | $3,685,214.35 | $3,134,729.03 |
| Rank 4of 6 | BASE, SURFACING & PAVEMENT MARKINGS | HARRISON | 2017-01-05 | $570,363.57 | $474,176.69 |
| Rank 8of 8 | UPGRADE BRIDGE AND APPROACH RAILING | POLK | 2017-01-05 | $1,261,921.50 | $796,806.25 |
| Rank 2of 5 | SAFETY TREAT FIXED OBJECTS | WOOD | 2017-01-04 | $3,523,595.80 | $3,239,526.94 |
| Rank 7of 11 | SAFETY TREAT FIXED OBJECTS | CHEROKEE | 2017-01-04 | $1,322,623.75 | $1,037,127.00 |
| Rank 2of 6 | SAFETY TREAT FIXED OBJECTS | HOUSTON | 2017-01-04 | $3,228,212.00 | $2,981,766.60 |
| Rank 5of 11 | SAFETY TREAT FIXED OBJECTS, ETC. | SHELBY | 2017-01-04 | $1,681,215.00 | $1,254,729.10 |
| Rank 4of 6 | GR,BS,SURF & PAV MRKS | BOWIE | 2017-01-04 | $3,016,838.45 | $2,668,802.19 |
| Rank 5of 7 | RECONSTRUCT AND WIDEN PAVEMENT | NACOGDOCHES | 2016-12-01 | $6,120,940.72 | $4,724,025.62 |
| Rank 3of 12 | CULVERT REPLACEMENT | SMITH | 2016-12-01 | $395,521.00 | $347,999.94 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.