Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
427 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 5of 9 | REPLACE BRIDGE & APPROACHES | VAN ZANDT | 2020-03-05 | $1,217,835.60 | $1,069,893.40 |
| Rank 2of 4 | REPAIR & RESURFACE ROADWAY | WOOD | 2020-03-05 | $4,951,362.37 | $4,511,805.59 |
| Rank 2of 6 | BRIDGE REPLACEMENT | TYLER | 2020-03-05 | $796,637.60 | $783,916.45 |
| Rank 4of 8 | REPLACE BRIDGES & APPROACHES | ANDERSON | 2020-03-04 | $1,606,646.90 | $1,452,726.81 |
| Rank 5of 8 | REPLACE BRIDGE & APPROACHES | CHEROKEE | 2020-03-04 | $2,313,343.40 | $1,943,346.80 |
| Rank 5of 7 | REPLACE BRIDGE & APPROACHES | WOOD | 2020-03-04 | $1,650,221.35 | $1,332,153.39 |
| Low bidof 12 | SAFETY TREAT FIXED OBJECTS | HARRISON | 2020-03-04 | $1,847,139.90 | $1,847,139.90 |
| Rank 3of 9 | BRIDGE REPLACEMENT | VAN ZANDT | 2020-03-04 | $579,404.05 | $552,443.00 |
| Rank 5of 6 | STABILIZE BANK OF TRINITY RIVER | LIBERTY | 2020-02-07 | $18,119,317.40 | $15,552,095.94 |
| Rank 3of 3 | CEMENT TREAT BASE, ACP AND PAV MRKS | HARRISON | 2020-02-06 | $6,315,031.27 | $5,981,441.56 |
| Rank 5of 9 | IMPROVING DRAINAGE, CULVERTS, UPGRADE GUARD RAIL | VAN ZANDT | 2020-02-06 | $3,098,660.00 | $2,544,980.75 |
| Rank 4of 7 | GUARD RAIL, DRAINAGE STRUCTURES, BRIDGE RAIL | VAN ZANDT | 2019-12-03 | $5,248,423.51 | $4,537,223.82 |
| Low bidof 5 | PLANING, PAVEMENT REPAIR, OCST, OVRLY, PV MK | WOOD | 2019-10-02 | $1,442,127.50 | $1,442,127.50 |
| Rank 3of 3 | CEMENT TREAT,FLEX BASE,SURFACING & PAVEMENT MARKS | UPSHUR | 2019-10-02 | $9,403,742.46 | $8,411,111.00 |
| Rank 4of 4 | SHLDR WIDEN, GRADING, PVT, DRNG, SIGNS, PV MK | HENDERSON | 2019-09-06 | $12,704,804.18 | $12,138,162.77 |
| Low bidof 6 | HAZARD ELIMINATION & SAFETY | FRANKLIN | 2019-08-07 | $801,629.40 | $801,629.40 |
| Low bidof 6 | BRIDGE REPLACEMENT | HARRISON | 2019-08-06 | $398,056.85 | $398,056.85 |
| Rank 4of 4 | GRADING, STRUCTURES, BASE & SURFACE | ANGELINA | 2019-06-05 | $43,491,491.76 | $37,447,954.88 |
| Rank 5of 6 | BRIDGE REPLACEMENT | LEON | 2019-06-05 | $2,401,306.55 | $2,035,077.89 |
| Low bidof 6 | HIGHWAY IMPROVEMENT | SHELBY | 2019-06-04 | $5,760,486.49 | $5,760,486.49 |
| Rank 4of 5 | CEMENT TRT,FL BS,SURF & PAV MARKS | TITUS | 2019-05-08 | $12,737,913.61 | $11,689,370.97 |
| Rank 4of 4 | GRADING,CEM TRT BASE,ACP & PV MRKS | HARRISON | 2019-05-08 | $4,968,264.47 | $4,592,940.44 |
| Rank 2of 4 | CEMENT TREAT BASE, ACP AND PAV MRKS | HARRISON | 2019-05-07 | $2,525,017.84 | $2,388,393.75 |
| Rank 3of 7 | BRIDGE REPLACEMENT | LAMAR | 2019-05-07 | $1,194,822.45 | $1,008,565.12 |
| Rank 2of 4 | ACP SURFACE & PAV MARKINGS | PANOLA | 2019-05-07 | $5,366,066.40 | $4,609,876.39 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.