Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
20 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 3of 6 | CapEx-C Power to Pump | TRAVIS | 2026-07-02 | $15,891,034.64 | $7,779,122.15 |
| Rank 9of 10 | US 77 at 0.1 Mi. South of N. Jaeger St. | LEE | 2025-08-07 | $20,631,696.92 | $13,219,085.43 |
| Rank 5of 6 | BRIDGE MAINTENANCE | DALLAS | 2024-01-05 | $4,491,421.50 | $3,175,651.00 |
| Rank 5of 6 | DEMOLITION OF EXISTING TIMBER STRUCTURE | ARANSAS | 2020-06-05 | $5,240,160.00 | $2,681,504.00 |
| Rank 4of 6 | REPLACE BRIDGE AND APPROACHES | ORANGE | 2019-01-08 | $5,036,748.90 | $3,732,469.40 |
| Rank 4of 7 | PAINT & REPAIR BRG, SURF, PAV'T MRK | BEXAR | 2018-09-06 | $2,221,349.00 | $1,479,046.42 |
| Rank 7of 8 | REPLACE DECK AND STRUCTURAL REPAIRS | WILLIAMSON | 2018-05-02 | $1,586,487.55 | $1,149,642.65 |
| Rank 3of 6 | BRIDGE PREVENTIVE MAINTENANCE | WILLIAMSON | 2018-01-09 | $186,450.00 | $169,160.00 |
| Rank 9of 12 | BRIDGE MAINTENANCE | CORYELL | 2017-12-05 | $481,036.85 | $277,779.40 |
| Rank 3of 6 | BRIDGE REPAIR | HOUSTON | 2017-10-04 | $2,241,821.75 | $1,384,827.00 |
| Rank 9of 10 | CONSTRUCT SOUNDWALL | HARRIS | 2017-08-09 | $4,461,701.40 | $3,375,271.00 |
| Rank 6of 6 | BRIDGE REPLACEMENT | CALLAHAN | 2017-08-08 | $1,691,212.30 | $1,472,447.50 |
| Rank 5of 9 | REPLACE SWING BRIDGE | MATAGORDA | 2017-07-12 | $49,189,185.82 | $41,231,130.96 |
| Rank 3of 3 | CONC OVLY DECK REHAB | FALLS | 2017-07-11 | $4,675,640.40 | $3,535,361.50 |
| Rank 6of 11 | REPLACE EXISTING BRIDGE FACILITY | MILAM | 2017-06-06 | $586,006.75 | $447,590.00 |
| Low bidof 5 | REHAB EXISTING BRIDGE | TAYLOR | 2017-06-06 | $2,981,256.75 | $2,981,256.75 |
| Rank 5of 6 | REPAIR BEAMS AND REPLACE BENT CAPS | REEVES | 2017-04-04 | $1,251,897.60 | $936,605.40 |
| Rank 2of 4 | REPLACE BRIDGE AND APPROACHES | ORANGE | 2017-02-03 | $11,561,340.70 | $11,399,710.80 |
| Rank 6of 6 | REPLACE BRIDGE AND APPROACHES | WHARTON | 2017-01-05 | $1,555,880.68 | $902,792.10 |
| Rank 7of 8 | REPLACE BRIDGE AND APPROACHES | MCLENNAN | 2017-01-04 | $1,090,200.70 | $697,709.55 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.